My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
have proper manufacturer's documentation must also be stored at a separate location, <br /> until all documentation has been received and approved. <br /> 4.4.2 Acceptance Testing <br /> Tests. The QA/QC Consultant will ensure that samples are removed and forwarded to the <br /> Geosynthetic CQA Laboratory for testing at a frequency of one sample per lot or one per 100,000 sq. <br /> ft., whichever is more stringent, to ensure conformance to both the Specifications and the <br /> Manufacturers list of guaranteed properties.The material will be sampled at the site by the QA/QC <br /> Inspectors or at the manufacturing plant by an independent third party under the direction of the <br /> QA/QC Consultant. <br /> As a minimum,the following shall be established for the Geocomposite: <br /> Geonet Core (measurements shall be taken on the edge of the sample where geotextile <br /> and geonet are unbonded): <br /> • Thickness (ASTM D5199) <br /> Geocomposite: <br /> • Peel Strength(GRI GC7) <br /> • Index Transmissivity (ASTM D4716) <br /> Direct Shear Testing (ASTM D5321). The QA/QC Consultant shall perform a direct shear test <br /> (minimum one test per project or material type) between the project specific GCL, single-sided <br /> textured HDPE geomembrane (textured side towards GCL), and geocomposite drainage net per <br /> ASTM D5321 and as described in the Specifications. <br /> The QA/QC Manager will review all acceptance test results and report any non-conformance to the <br /> Construction Manager and Contractor. <br /> Sampling Procedures. Samples will be taken across the entire width of the roll. Unless otherwise <br /> specified, samples will be 3 ft(1 m) long by the roll width. The QA/QC Consultant will mark the <br /> machine direction on the samples with an arrow. <br /> Page 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.