Laserfiche WebLink
Consolidated Forward. _. Landfill Page 8 <br />is All employees will be given appropriate training regarding the poze:nial for exposure to <br />hazardous materials. This training will include a 24-hour hazardous waste operations course <br />and an annual 8 -hour refresher course for -personnel involved in the load checking" program <br />where the incoming loads are screened for hazardous materials. <br />The landfill will not accept any special waste that may potentiall1v contain hazardous Ievels of <br />regulated substances. <br />Dust control procedures specified in the Site Operations Plan (section 7.7.5 of the JTD) will <br />use the application of fine water spray at a minimum of twice dad`- on the active soil -covered <br />work areas, soil excavation areas, and soil stockpile areas where F?l,�ve dust may exist. <br />Existing fire protection facilities will be maintained to the satisfacrioa of the Lathrop - <br />Manteca Fire Protection District. <br />Dust exposure of site workers will be monitored periodically, at t�i_- discretion of the Iandfill <br />manager, to evaluate if any additional respiratory protection or dt_.;� ;sppression (watering) <br />mitigation is needed. <br />Additional engineering controls will be implemented by the site ooc—___tor, if needed based on <br />the evaluation of the site health and safety or operations manager, to control dust emissions. <br />Such controls might include wind -screens near unloading areas or use of dust <br />suppressants. <br />If the above controls cannot reduce employee dust exposure below- acceptable levels as <br />determined by Forward (considering factors including irritation and annoyance to <br />employees), site personnel at risk will be supplied "ith gloves, cosIeralls, eye protections and <br />respirators, with associated training in their use. <br />Wastes must not leave the landfill on workers' clothing. Workers who have had direct <br />contact with waste, or who have performed operations that may insolve direct contact with <br />wastes (such as equipment maintenance or asbestos handling), will agar disposable clothing <br />or change clothing before leaving the site. The potentially con clothing will be <br />cleaned or disposed as appropriate. <br />To avoid cross -contamination from contaminated to non-contaniffi2ted sites, the applicant <br />will provide a portable decontamination facility with self-contah3cd water supply for <br />personnel and equipment. <br />For asbestos, a strict Asbestos -Containing Nfaterials (ACM) hang program will be <br />developed, and will include the following; <br />(a) Bagged ACM will be dumped only onto the working face cF the asbestos <br />disposal area and not onto the flat compacted landfill su:rfa e. Bulldozers will <br />then push soil cover onto the working face to cover the ACNi bags and will not <br />contact the bags. <br />(b) For Forward site employees engaged in handling asbestos materials, Forward <br />will implement one of the following; <br />