Laserfiche WebLink
Water Quality Monitoring Report <br />Forward Landfill <br />Monitoring points at the Austin Unit have been constructed to monitor the <br />groundwater/surface water at the facility as follows: <br />MONITORING POINT <br />MONITORING POINT I.D. <br />Groundwater Monitoring <br />Well - Background <br />AMW-2 <br />DMP Wells <br />AMW-5R, AMW-6, AMW-7, AMW-12 <br />CAP/EMP Wells (Shallow) <br />AMW-1, AMW-4, AMW-10, AMW-11, AMW-13, AMW-14, AMW-18, <br />AMW-19, AMW-21S, AMW-22S, AMW-24SR, AMW-29S, AMW-30S, <br />AMW-31S, AMW-32S <br />CAP/EMP Wells (Deep) <br />AMW-13B, AMW-1813, AMW-19BR AMW-21, AMW-22, AMW-24R, <br />AMW-25, AMW-26R, AMW-28, AMW-29, AMW-30, AMW-31, <br />AMW-32 <br />Domestic Wells <br />7898-A, 8106-A <br />Surface Water Stations <br />ASW -1, ASW -2 <br />Lysimeters <br />FU -03, FU -04W, FU -04E, FU -05, FU -06, LY -POND -N, LY -POND -S <br />With the exception of Waste Management Unit (WMU) A, the Forward Landfill has been <br />operated as a Class II and Class III landfill since it opened in 1973. However, from 1979 <br />to 1984, industrial wastes, consisting primarily of strontium and barium sludge, were <br />accepted at the landfill and placed in WMU A. In 1984, the DTSC determined that WMU <br />A should be closed as a Class I hazardous waste management unit. The final cap was <br />completed in 1989 (Kleinfelder 1999). <br />A hazardous waste facility post -closure permit ("the initial post -closure permit") was <br />issued for the Site on January 2, 1990. On February 25, 1994, Forward Landfill <br />requested that the DTSC modify the initial post -closure permit to reduce the number of <br />sampling events from Height per year (two quarterly) to four per year. DTSC approved <br />this request ("Modification No. 1") in a letter dated March 2, 1994 (Kleinfelder 1999). <br />On November 4, 1994, a revised post -closure maintenance plan (RPCMP) was submitted <br />to the DTSC. The DTSC approved the RPCMP and issued Permit Modification No. 2. This <br />modification superceded all of the requirements of the initial post -closure permit and <br />Modification No. 1. The DTSC issued a revised Postclosure Permit on June 30, 2003. <br />Forward Landfill implemented the Corrective Action Program for the site, which was <br />based on a two-year proof period that began on June 7, 1995. <br />WDR Order No. 115-2003-0049 was formally adopted by the RWQCB on March 14, 2003, <br />which combined the former Austin and Forward Landfills into one landfill, now known <br />as the Forward Landfill. <br />• <br />M:\ 2015.0014\FA_4Q15.docx <br />1/29/2016, Rev. 0 <br />