side-slopes are provided with a geonet drain layer. An operations soil layer, not less than <br /> 2 feet thick, was placed over the geonet prior to the placement of refuse. Leachate drains <br /> through geonet to shallow "V" trenches, then through pipes to a leachate sump. The <br /> interface between Modules 2 and 3 is composed of an anchor trench/berm, raised <br /> approximately three feet above the surrounding surfaces. <br /> • Module 4 was constructed in 2003. This module is lined with a composite liner <br /> comprised of 60-mil HDPE over GCL. On the side-slopes, the composite liner is place <br /> on a 6-inch thick layer of prepared soil, and is overlaid by a geonet drain layer. At the <br /> base, the composite liner is placed over a one-foot thick layer of soil with not less than <br /> 30% passing 200 sieve, compacted to not less than 90% relative density. A 9-inch layer <br /> of pea gravel is installed above the bas liner, over which filter fabric and not less than two <br /> feet of operations soil is placed. In addition, the first two feet of refuse placed on the <br /> operations layer is "packer waste" or other material free of large objects that could <br /> penetrate through the operations layer and the liner beneath. <br /> 6.3.2 Future Design <br /> The landfill units are designed per Title 27 standards and Subtitle D under the direction of a <br /> registered civil engineer. Typical designs include the following: <br /> • Liners <br /> The units will be lined with double composite liners consisting-of a geosynthetic clay <br /> liner and a geomembrane or an alternative liner either of which are overlain by a leachate <br /> collection and removal system. <br /> Liners will be installed to cover all natural geologic materials that would otherwise be in <br /> contact with waste. <br /> • Precipitation and Drainage Control <br /> The units will be designed and constructed to limit, ponding, infiltration, inundation, <br /> erosion, slope failure,washout, and overtopping. <br /> Diversion and drainage facilities will be designed, constructed, and maintained to <br /> accommodate the anticipated volume of precipitation and peak flows from surface runoff, <br /> North County RC&SL Page 27 of 48 Public Works/Solid Waste <br /> County of San Joaquin—November 30,2004 <br /> JTD <br />