Laserfiche WebLink
• The Method and timing of ADC application <br /> • The anticipated volume of ADC that will be used <br /> • ADC use record keeping <br /> 7.3.3 Composting <br /> The County intends to seek approval for a composting facility at the NCR&SL. The south-east <br /> portion of the site has been tentatively selected for composting windrows. Green waste and other <br /> composting materials would be received during normal landfill operation hours. The finished <br /> compost would be sold or used on site. Greenwaste materials may be diverted from the <br /> composting facility for use as alternate daily cover subject to approval of greenwaste for this <br /> purpose. <br /> 7.4 EQUIPMENT <br /> The following equipment is present onsite (as of September 2004): <br /> 1- CAT 950F Wheel Loader <br /> 1 -John Deere 644E Wheel Loader <br /> 4—WhiteNolvo Roll-off Trucks <br /> 1 —White/GMC Tractor <br /> 1 — 120 CY Steel Transfer Trailer <br /> 2—3,000 gallon Water Trucks <br /> 1 —CAT 623E Earth Scraper <br /> 1 —CAT 623F Earth Scraper <br /> 1 —CAT 826G Landfill Compactor <br /> 1 —CAT D8R Tractor Dozer <br /> 1 —CAT 825C Dirt Compactor <br /> 1 —John Deer 570A Motor Grader <br /> 1-Maintenance Truck <br /> In the event of equipment failure, backup and standby equipment will be furnished by the San <br /> Joaquin County Department of Public Works or rented from local heavy equipment rental <br /> companies. <br /> North County RC&SL Page 39 of 48 Public Works/Solid Waste <br /> JTD County of San Joaquin—November 30,2004 <br />