My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:25 PM
Creation date
7/3/2020 11:01:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_3
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2006_3.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Sec. 10-1, Construction Details <br /> Std. Spec.Sec 13 <br /> Special <br /> Page 9 of 9 <br /> PART 4 - MEASUREMENT AND PAYMENT <br /> 4.01 SOIL GAS WELL <br /> A. MEASUREMENT <br /> Measurement for installing soil gas wells shall be by the linear foot. Contractor <br /> shall measure the depth from ground surface to the bottom of each boring drilled <br /> before well installation with a weighted measuring tape in the presence of the <br /> Engineer. <br /> ' B. PAYMENT <br /> Payment for each soil gas well shall be by the unit price per linear foot quoted in <br /> the bid proposal. The unit price quoted shall include full compensation for <br /> furnishing all labor, materials, tools, equipment, and incidentals, securing well <br /> permits from EHD, drilling well boring, installing the soil gas well with all EHD <br /> ' inspections, installing the probe pipe valves, disposing or distributing boring spoils <br /> as specified, and removing all construction litter, and surplus backfill materials <br /> off-site. <br /> ' 4.02 ABANDONED BORINGS <br /> A. MEASUREMENT <br /> Measurement for payment for abandoned borings shall be per linear foot <br /> measured with a weighted measuring tape in the presence of the Engineer. <br /> B. PAYMENT <br /> Payment for abandoned borings at each site shall be by the unit price per linear <br /> foot quoted in the bid proposal. No adjustment of compensation will be made for <br /> any increase or decrease in the quantities of abandoned wells, regardless of the <br /> reason for such increase or decrease. The provisions in Section 4-1.0313, <br /> "Increased or Decreased Quantities," shall not apply to items for abandoned wells. <br /> END OF SECTION <br /> NA2PerimLFGwells 08\Specs\Sect 13-S Soil Gas Well.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.