My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 5:58:06 PM
Creation date
7/3/2020 11:02:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2009
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2009.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L] <br />E <br />E <br />Location: North County Sanitary Landfill <br />CQA/Engineer Pete Holland, CEG <br />Prepared by: PH <br />Owner/Client: San Joaquin County Public Works <br />Contractor: LFG Control Inc. <br />Superintendent: Mark Penn (LFG) <br />Submitted to: SJC Public Works <br />Reviewed By: PH <br />Project No: 0346-0203-00 Day of Week: Thursday <br />Report Date: 7/23109 Time on Site: 8:00 am <br />8-00 am: Arrived onsite. Drillers onsite already. Drillers clear out hole, prep for construction. <br />9:00 am: Natalia (Env. Health) arrives onsite. <br />9:05 am: Construction of SG -17 probes begins. Natalia confirms the length of probes and length of <br />perforated sections. <br />11:40 am: Completed installing probes for SG -17. Natalia here during installation/construction and had no <br />issues. <br />12:00 pm: Mobilize to SG -13. Driller (John) refuses to drill at the staked location because its under power <br />lines. We moved over to SG -12 instead. <br />12:15 pm: Tim (Public Works) arrives. I showed him situation with SG -13 under power lines and suggest <br />moving SGA 3 location 15 feet south away from power lines. <br />12:30 pm: Begin drilling SGA 2. Drilling is slow because of hard ground. <br />4:15 pm: Leave site. Drilled to 45 ft. <br />I of I <br />
The URL can be used to link to this page
Your browser does not support the video tag.