L] <br />E <br />E <br />Location: North County Sanitary Landfill <br />CQA/Engineer Pete Holland, CEG <br />Prepared by: PH <br />Owner/Client: San Joaquin County Public Works <br />Contractor: LFG Control Inc. <br />Superintendent: Mark Penn (LFG) <br />Submitted to: SJC Public Works <br />Reviewed By: PH <br />Project No: 0346-0203-00 Day of Week: Thursday <br />Report Date: 7/23109 Time on Site: 8:00 am <br />8-00 am: Arrived onsite. Drillers onsite already. Drillers clear out hole, prep for construction. <br />9:00 am: Natalia (Env. Health) arrives onsite. <br />9:05 am: Construction of SG -17 probes begins. Natalia confirms the length of probes and length of <br />perforated sections. <br />11:40 am: Completed installing probes for SG -17. Natalia here during installation/construction and had no <br />issues. <br />12:00 pm: Mobilize to SG -13. Driller (John) refuses to drill at the staked location because its under power <br />lines. We moved over to SG -12 instead. <br />12:15 pm: Tim (Public Works) arrives. I showed him situation with SG -13 under power lines and suggest <br />moving SGA 3 location 15 feet south away from power lines. <br />12:30 pm: Begin drilling SGA 2. Drilling is slow because of hard ground. <br />4:15 pm: Leave site. Drilled to 45 ft. <br />I of I <br />