My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 5:58:06 PM
Creation date
7/3/2020 11:02:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2009
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2009.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lwrlri4tiBlIL"EMITI mil EMUTAT211 MIMIF-14 M11 <br />Location: North County Sanitary Landfill <br />CQA/Engineer: Kristin Sample, PE <br />Prepared by: KS <br />Owner/Client: San Joaquin County Public Works <br />lar Irl"CTOR <br />E4 <br />ENGINEERING, INC. <br />Contractor LFG Control Inc. <br />Superintendent: Mark Penn (LFG) <br />Submitted to: SJC Public Works <br />Reviewed By: PH <br />Project No: 03-16-0203-00 Day of Week.* Thursday <br />Eā Date: 7/23109 Time on Site: 7:00 am <br />7:00 am: Onsite. <br />7:30 ā 1:30pm: Drilled hole for SG -18. Sampled soils and logged. <br />11:00 am: At 55 ft had to pull auger to replace bit. <br />12:20 pm: Rig back up and running. <br />1:30 - 2:00pm: Brought boring logs to Pete (Vector) for review. <br />2:00 pm: Reviewed boring logs with Env. Health inspector Natalia ā OK to proceed. Drillers measured <br />borehole depth. <br />2:10 pm: Measured pipe lengths and perforation lengths with Kris (PC) and Natalia. OK to proceed. <br />2:15 pm: Begin construction of well SG -19. Constructed first gravel layer and bentonite plug, <br />3:30 pm: Stopped construction within 2"a <br />gravel layer at 29 ft bgs. Env. Health inspector offsite. <br />4:15 pm: Offsite. <br />I of 1 <br />E <br />E <br />[A <br />
The URL can be used to link to this page
Your browser does not support the video tag.