Laserfiche WebLink
U <br />E <br />E <br />Location: North County. Sanitary Landfill <br />CQA/Engineer: Kristin Sample, PE <br />Prepared by: KS <br />Owner/Client; San Joaquin County Public Works <br />Contractor: LFG Control Inc. <br />Superintendent: Mark Penn (LFG) <br />Submitted to: SJC Public Works <br />Reviewed By: PH <br />Project Na: 03-16-0203-00 Day of Week: Tuesday <br />Report Date: 7128109 Time on Site: 7:00 am <br />7:00 am: Onsite. Drilling at SG -15. <br />8:30 am: Finished drilling SG -15. Brought logs to Pate (Vector) for review. OKtoproceed. <br />9:00 am; Back at SGA 5 site. <br />9:10 am: Env. Health inspector Natalia onsite. Observed pipe measurements. OK to proceed with <br />construction of SGA 5. <br />9:25 am: Natalia (Env. Health) has car stuck at gate and left SGA 5 site. Natalia said was ok to proceed <br />with constructing well while she went back to main gate. Natalia back around 10 am. <br />10:30 am: Discussed Joyesh's (Solid Waste) comments about minimum pipe height above ground surface <br />with Mark (LFG). <br />11:20 am: Finished construction of SG -15. <br />11:30 am: Drillers moved to Sg-16 site. <br />11:45 am: Two different locations are marked for SG -16. Tim (Public Works) onsite at SG -16, <br />12:40 pm: Joyesh (Solid Waste) and Time onsite. Correct location is at the stake, not rebar. <br />12:50 pm: Began drilling $G-16. <br />3:15 pm: Stopped drilling SG•16 at 55 ft. <br />3:30 pm: Offsite. <br />I of I <br />