My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 7:40:13 AM
Creation date
7/3/2020 11:03:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
eruary 2014 <br />TABLE D-2 - NORTH COUNTY RECYCLING CENTER AND SANITARY LANDFILL - SAN JOAQUIN COUNTY <br />NON -WATER RELEASE CORRECTIVE ACTION COST ESTIMATE <br />SUBSURFACE FIRE IMPACTS <br />Unit <br />Total <br />Item Description Units <br />Price <br />Quantity <br />Cost <br />5 LANDFILL GAS CONTROL <br />Components: Installation of vertical landfill gas extraction well. Assumes 1 landfill gas well will <br />need to be reconstructed. <br />Drill and Install Landfill Gas Extraction Well If <br />$ <br />100.00 <br />100 <br />$ <br />10,000.00 <br />Wellhead Assembly ea <br />$ <br />1,000.00 <br />1 <br />$ <br />1,000.00 <br />4 -inch SDR 17 HDPE Collection Lateral If <br />$ <br />20.00 <br />200 <br />$ <br />4,000.00 <br />Field CQA (20% of Construction Costs) `Yo <br />20`y <br />1 <br />$ <br />3,000.00 <br />Subtotal - Landfill Gas Control <br />$ <br />18,000.00 <br />6 EROSION CONTROL <br />Components: Hydroseeding of surface with native plant species. <br />Seeding of Final Surface with Native Plant Species acre <br />$ <br />2,500.00 <br />0.2 <br />$ <br />500.00 <br />Foreman hr <br />$ <br />82.50 <br />8 <br />$ <br />660.00 <br />Laborersl hr <br />$ <br />44.33 <br />16 <br />$ <br />709.28 <br />Subtotal - Erosion Layer <br />$ <br />1,869.28 <br />3of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.