Laserfiche WebLink
File No. 20-1008-36 " KLEINFELDER <br /> July 14, 1995 <br /> The SM stockpile borrow soil was transported by haul trucks from Granite's Tracy plant to the <br /> test pad where additional lab testing was performed. <br /> TFST PAD CONFIGURATION <br /> The test pads were approximately 150 feet in length and approximately 25 feet wide. The long <br /> axis of Test Pads 1, 2, and 3 were aligned in a east/west direction. Test Pads 4 and 5 were <br /> aligned in northwest/southeast and north/south directions, respectively. The County staked the <br /> test pad areas. <br /> The test pads were designed to consist of the following blends of materials with corresponding <br /> minimum compaction requirements (by percentage dry weight): <br /> • Test Pad 1 - 80% Stockpile/20% red clay at 95 percent relative compaction <br /> • Test Pad 2 - 70% Stockpile/30% red clay at 90 percent relative compaction <br /> • Test Pad 3 - 80% Stockpile/20% Ione clay at 92 percent relative compaction <br /> • Test Pad 4 -70% Stockpile/30% red clay at 90 percent relative compaction <br /> • Test Pad 5 - 100% Stockpile at 90 percent relative compaction <br /> Test s 1 through 4 are required to meet maximum permeability specifications of 1x10 <br /> P� g �1 Pe tY <br /> cm/sec. Test pads 1, 2, 3, and 5 were constructed on fairly level surfaces. Test Pad 4 was <br /> constructed on a slope, to evaluate compaction. This test pad has the same soil composition as <br /> Test Pad 2. Test pad 5 is required to meet a maximum permeability specification of lx 10-5 <br /> cm/sec, This test pad material type may be used as an alternative cover based on HELP <br /> modeling. <br /> SITE PREPARATION <br /> Prior to construction of the test pads, the site was cleared of all brush, grass and any other organic <br /> matter which had grown subsequent to the completion of the foundation layer. Foundation <br /> material removed during the course of this procedure was replaced and the foundation layer was <br /> restored to its original final grade and surveyed by the County. The foundation layer was <br /> compacted to a minimum relative compaction of 90 percent (ASTM test method D-1557). <br /> TEST PAD CONSTRUCTION <br /> Approximately 204 tons of SM borrow materials were placed by County personnel on Test Pads 1 <br /> and 3; 170 tons of SM borrow was placed on Test Pads 2 and 4. Approximately 15 inches of <br /> GSM.-md CH195 Page 2 of 10 July 14, 1995 <br /> 20-1008-36 0 1995,Kleinfelder,Inc. <br />