My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:38 PM
Creation date
7/3/2020 11:05:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2012
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2012.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br />0 <br />u <br />0 <br />n <br />11 <br />letter or Change Order. If any comment made to the submittal by the <br />Engineer, results in a change in the Contract Sum, the Contractor shall <br />notify the Engineer and the work may not be undertaken until written <br />authorization to proceed is issued. <br />c. Examined and Returned for Correction — The work involved may not <br />proceed. Submittal must be corrected and resubmitted. <br />d. Rejected. <br />M. When submittals are returned marked with either "Examined and Returned for <br />Correction" or "Rejected" the Contractor shall make such revisions and corrections <br />as required and resubmit the submittal with the same submittal number followed by <br />RI (Revision One). <br />N. Verbal communication regarding submittals between the Engineer and the <br />Contractor may occur for the purpose of clarifying a submittal and facilitating the <br />review process is so agreed by all parties. Such verbal communication is non- <br />binding. The Contractor acts on verbal communication at his own risk. <br />O. Submittals shall include sufficient information to allow the Engineer to verify that <br />the product proposed for use on the project complies with the specifications. The <br />Engineer will be the sole judge of the sufficiency of the information. <br />P. Review of submittals by the Engineer does not relieve the. Contractor of <br />responsibility to follow the contract specifications, nor does it relieve the contractor <br />from responsibility for errors or omissions in the submittal. Allowed deviations <br />from the contract specifications, if any, will be specifically and explicitly identified <br />in writing by the Engineer. <br />Q. A submittal will be accepted or rejected as a whole. Inadequacy of a part of a <br />submittal will result in the rejection of the entire submittal. Combining submittals <br />of more than one (1) product or specification section is at the Contractor's own risk. <br />1.02 DEFINITIONS <br />A. Refer to Section 01075 —Technical Specification Definitions. <br />1.03 SUBMITTALS <br />A. Submittal Register: <br />1. The Contractor shall prepare and transmit a Submittal Register listing all <br />submittals required by each Specification Section within fifteen (15) calendar <br />days after County's Notice to Proceed. <br />SHAW ENVIRONMENTAL, /NC, <br />San Joaquin County — Extension of Cap Corral Hollow Sanitary Landfill — CH Closure Cap Ext Proj_Technical Specs -4-19-12 Revl.DocRev. 0, 04/05/2012 <br />Submittals <br />01300-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.