My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:38 PM
Creation date
7/3/2020 11:05:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2012
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2012.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u <br />r <br />2. The Contractor shall transmit each submittal to the Engineer for review in <br />accordance with this section with sufficient time for return for correction or <br />rejection, and resubmittal(s) for the Engineer's final approval. The Contractor <br />shall obtain acceptance of applicable submittals before applicable material <br />shipment. <br />3. The Contractor shall transmit separate submittals by each Specification <br />Section. The Register shall include submittal delivery dates, required return <br />dates, material delivery dates, and other pertinent data required to ensure that <br />the project schedule is met by the Contractor. <br />4. The Contractor shall update the accepted Submittal Register weekly to reflect <br />progress and any additions or deletions to the Submittal Register. Copies of <br />the updated Submittal Register shall be furnished to the Engineer. <br />B. Shop Drawings: <br />1. Shop drawings shall establish the actual detail of all manufactured or <br />fabricated items, indicate proper relation of adjoining work, and incorporate <br />minor changes of design or construction to suit actual conditions. Shop <br />drawings shall be drawn to scale and shall be completely dimensioned. Do not <br />use reproductions of the Construction Drawings. <br />2. Sheet sizes of shop drawings shall be 8-1/2 inches by 11 inches, 11 inches by <br />17 inches, 17 inches by 22 inches, 22 inches by 34 inches, or 34 inches by <br />44 inches. <br />3. A clear space of 3 -inches by 3 -inches shall be provided on each drawing for <br />the Engineer's review stamp and comments. <br />4. Shop drawings shall be submitted to the Engineer on bond paper. <br />' 5. After the Engineer has completed his review of shop drawings, he will return <br />copies to the Contractor indicating the approval status as described in <br />Article 1.01.x. <br />C. Samples: <br />1. The Contractor shall furnish the Engineer at least three (3) samples of each of <br />the various materials, except field testing samples, together with the finish <br />thereon, as specified for and intended to be used on or in the Work. <br />2. The Contractor shall submit all samples to the Engineer for review and obtain <br />written acceptance from Engineer before purchasing, fabricating, applying, or <br />installing such materials and finishes, unless otherwise stated. The Engineer <br />SHAWENVIRONMENTAL, INC. <br />San Joaquin County — Extension of Cap Corral Hollow Sanitary Landfill — CH Closure Cap Ext Proj_Technical Specs -4-19-12 Revl.DocRev. 0, 04/05/2012 <br />Submittals <br />1 01300-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.