My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2012_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2012_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 7:32:56 AM
Creation date
7/3/2020 11:05:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2012_1
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2012_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� i� i� >� � iiili■� il�w � � ® ® � � ® i� <br /> Table 5-1 <br /> Extension of Closure Cap of the CHL '—Geosynthetics and HDPE Pipe CQA Testing <br /> Test Minimum Test Frequency Requirement <br /> Geomembrane; Project Specification Section 02779 <br /> Manufacturer Source Quality Control Product data for each roll As specified in paragraph 1.15 and 1.17 of the specifications <br /> and Interface Shear Testing <br /> Conformance Testing Varies, but for most tests per 1/100,000 As specified in paragraph 2.03 of the specifications <br /> square feet supplied <br /> Trial Welds, Peel and Shear tests Minimum of two trial welds for peel and shear As specified in paragraph 3.05 of the specifications <br /> testing per day per equipment and per <br /> welder with one prior to the start of work and <br /> one at mid shift <br /> Installation Observation and Continuous As specified in paragraph 3.11 of the specifications <br /> Documentation <br /> Non-destructive Weld Testing 100 percent of all welds As specified in paragraph 3.12 of the specifications <br /> Destructive Weld Testing At seam end of seams between panels, at As specified in paragraph 3.16 of the specifications <br /> butt seams, and every 1,000 fee of seam <br /> Repair Observation and Documentation Continuous As specified in paragraph 3.20 of the specifications <br /> Geocomposite; Project Specification Section 02773 <br /> Manufacturer Source Quality Control Product data for each roll As specified in paragraph 1.07 of the specifications <br /> Conformance Testing Varies, but for most tests per 1/100,000 As specified in paragraph 2.03 of the specifications <br /> square feet supplied <br /> Erosion Control Fabric; Project Specification Section 02774 <br /> Manufacturer Source Quality Control I Product requirements As specified in paragraph 2 of the specifications <br /> HDPE Pipe; Project Specification Section 02750 <br /> Manufacturer Source Quality Control Product requirements Asspecified in paragraph 2 of the specifications <br /> Surveying As-built survey of each structure and every As specified in section 01052 paragraph 1.04 of the <br /> 100 LF of installed pipe s ecifications <br /> CH CQA Plan 041712 Rev2a.doc 5-1 Construction Quality Assurance Plan <br /> 4.24.12 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.