Laserfiche WebLink
� i� i� >� � iiili■� il�w � � ® ® � � ® i� <br /> Table 5-1 <br /> Extension of Closure Cap of the CHL '—Geosynthetics and HDPE Pipe CQA Testing <br /> Test Minimum Test Frequency Requirement <br /> Geomembrane; Project Specification Section 02779 <br /> Manufacturer Source Quality Control Product data for each roll As specified in paragraph 1.15 and 1.17 of the specifications <br /> and Interface Shear Testing <br /> Conformance Testing Varies, but for most tests per 1/100,000 As specified in paragraph 2.03 of the specifications <br /> square feet supplied <br /> Trial Welds, Peel and Shear tests Minimum of two trial welds for peel and shear As specified in paragraph 3.05 of the specifications <br /> testing per day per equipment and per <br /> welder with one prior to the start of work and <br /> one at mid shift <br /> Installation Observation and Continuous As specified in paragraph 3.11 of the specifications <br /> Documentation <br /> Non-destructive Weld Testing 100 percent of all welds As specified in paragraph 3.12 of the specifications <br /> Destructive Weld Testing At seam end of seams between panels, at As specified in paragraph 3.16 of the specifications <br /> butt seams, and every 1,000 fee of seam <br /> Repair Observation and Documentation Continuous As specified in paragraph 3.20 of the specifications <br /> Geocomposite; Project Specification Section 02773 <br /> Manufacturer Source Quality Control Product data for each roll As specified in paragraph 1.07 of the specifications <br /> Conformance Testing Varies, but for most tests per 1/100,000 As specified in paragraph 2.03 of the specifications <br /> square feet supplied <br /> Erosion Control Fabric; Project Specification Section 02774 <br /> Manufacturer Source Quality Control I Product requirements As specified in paragraph 2 of the specifications <br /> HDPE Pipe; Project Specification Section 02750 <br /> Manufacturer Source Quality Control Product requirements Asspecified in paragraph 2 of the specifications <br /> Surveying As-built survey of each structure and every As specified in section 01052 paragraph 1.04 of the <br /> 100 LF of installed pipe s ecifications <br /> CH CQA Plan 041712 Rev2a.doc 5-1 Construction Quality Assurance Plan <br /> 4.24.12 8 <br />