My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2012_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2012_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 7:32:56 AM
Creation date
7/3/2020 11:05:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2012_1
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2012_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> 6.0 Vertical LFG Extraction Wells (Reserved) <br /> 7.0 Documentation <br /> The quality assurance program depends on thorough monitoring and documentation of <br /> construction activities. Therefore, the CQA Monitor will document that quality assurance <br /> requirements are addressed and satisfied. Documentation consists of daily record-keeping, <br /> ' testing and installation reports, nonconformance reports (if necessary), progress reports, <br /> construction drawing revisions, and a construction completion report. Example documentation <br /> forms are provided in Appendix A and discussed further in this section. <br /> 7.1 Daily Record-Keeping <br /> The CQA Monitor will document construction inspection and testing activities with logs, reports, <br /> and photographs. The data sheets that will be used for CQA documentation are presented at the <br /> end of this section. The CQA Engineer may revise data sheets presented in this CQA Plan as <br /> necessary. <br /> The daily field report will summarize ongoing construction and discussions with the contractor, <br /> and will be prepared by the CQA Monitor. Depending on specific activities, the report will <br /> include the following: <br /> Date project name location and other identifying information; <br /> ° �P J Y g <br /> ' ° Weather conditions; <br /> A narrative describing construction activities underway; <br /> ' ° CQA activities performed; <br /> Summary of CQA and CQC tests performed and test methods used; <br /> ° Summary of CQA and CQC test results, including corrective actions taken for <br /> construction materials not in compliance with project specifications; <br /> ® Summary of LFG trenches, piping, and mechanical equipment installed; <br /> ' ° Documentation of borrow sources used, placement activities for soils, and any visual <br /> changes in borrow soils; <br /> ° Corrective actions taken to repair damage; <br /> Visual observations of construction activities, including any concerns; <br /> CH CQA Plan 041712 Rev2a.doc 7-1 <br /> 4.24.12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.