Laserfiche WebLink
® Section 6.0 describes the procedures for documentation and record-keeping. <br /> All parties involved in the Extension of Closure Cap for Corral Hollow Sanitary Landfill should <br /> be thoroughly familiar with this Plan, the Construction Drawings, and the Construction <br /> Specifications. <br /> 1.2 Definitions <br /> Wherever the terms listed below are used in this Plan, their intent and meaning shall be <br /> interpreted as defined in this section. <br /> ASTM—ASTM International (formerly American Society for Testing and Materials), 100 Barr <br /> Harbor Drive, PO Box C700, West Conshohocken, Pennsylvania, 19428-2959; also, the <br /> numerical designation of a standard specification, test method, or practice established by ASTM <br /> International. <br /> Caltrans — Caltrans (formerly California Department of Transportation), 1120 N Street, P.O. <br /> Box 942873, Sacramento, California 94273-0001; also, the numerical designation of a standard <br /> specification, test method, or practice established by Caltrans. <br /> Contract Documents — The official document set issued for the project, including bidding <br /> requirements, contract forms, contract conditions, Construction Drawings, Construction <br /> Specifications,addenda, and contract modifications. <br /> Contractor — The person or persons, firm, partnership, corporation, or any combination, private, <br /> municipal, or public,who,as an independent contractor,has entered into a contract with the County. <br /> ' Construction Completion Report—Report to be prepared at the completion of construction by <br /> the CQA manager who documents the as-built conditions and record drawings as discussed <br /> ' further in Section 6.7. <br /> Construction Drawings — The official plans, profiles, typical cross-sections, elevations, and <br /> details, as well as their amendments and supplemental drawings, which show the locations, <br /> character, dimensions, and details of the work to be performed. Construction drawings are also <br /> referred to as Contract Plans,Project Plans and/or Plans. <br /> Construction Quality Assurance — A planned series of observations and tests to verify that <br /> ' quality control functions have been performed adequately and determine compliance with plans and <br /> specifications. <br /> CH CQA Plan 041712 Rev2a.doc 1-2 Construction Quality Assurance Plan <br />