Laserfiche WebLink
LI <br />Mr. Padilla <br />Page 3 of 7 <br />C <br />5. For cover material that is imported, identify the daily <br />quantity needed and the hauling distance. The RDSI <br />only gives the amount needed for winter use. <br />6. The RDSI states no Saturday operations and the draft <br />permit states there will be Saturday operations, please <br />correct. <br />7. Provide information on the City's use of the landfill <br />for the storage/stockpiling of asphalt and concrete, <br />including the temporary storage of dirt from a <br />construction project and the locations of the on-site <br />stockpiles. Also, there is no mention of the method <br />for determining the amount of concrete, asphalt and <br />dirt delivered or how they are calculated into the <br />total tons per day. <br />11. A. The RDSI states that a load checking program has <br />been developed, please submit a copy. The load <br />checking program should consist of, but not be <br />limited to, the following activities: inspection <br />of random incoming loads; regular visual <br />inspection of the wastes deposited at the <br />facility; training of facility personnel in <br />hazardous waste recognition and proper hazardous <br />waste handling procedures; reporting incidents of <br />unlawful disposal to specific agencies (the names <br />and number should be stated); and installation of <br />signs at the facility entry way indicating that no <br />hazardous waste is accepted (a list of commonly <br />unacceptable wastes may be identified). <br />B. Describe storage and handling of hazardous waste <br />identified in the screening program; give maximum <br />storage time prior to removal and the isolation/ <br />storage location. <br />14. The RDSI states that dust is controlled by watering. <br />Please describe the equipment used for the watering, if <br />the water truck is at the Austin Road Landfill. Also, <br />if the water will be at the Austin Road Landfill, <br />please identify the time required to bring the water <br />truck to the subject site in case of a fire. <br />The RDSI discusses a maintenance area. This should be <br />identified on the site plan. <br />15. For the wood recovery activity provide the following <br />information: the location of the processing area <br />activity, the storage area, and the frequency of <br />removal of salvaged goods. <br />