Laserfiche WebLink
Mr. Padilla <br />Page 4 of 7 <br />(b) 1. Include the estimated tonnage or volume of each type of <br />waste received per operating day and year. <br />The table shows that in 1998 the peak load will be 500 <br />tpd. Please note that in order to exceed the permitted <br />capacity a permit revision will be required. <br />(c) 1. The RDSI states the total site acreage is 65, the draft <br />permit states 73.43. Please correct the discrepancy <br />and submit a copy of Figure 2 for review. <br />2. Specify the final estimated volume the site will occupy <br />in cubic yards. This figure must be consistent with <br />the final grading plan. If the site is currently being <br />used, state the existing volume that has already been <br />filled. <br />3. Provide actual calculations to show how the life <br />expectancy projection was derived. <br />(d) The map intended to meet this requirement is not clear. <br />1. Describe access conditions in detail. Discuss <br />provisions for turns across traffic, stacking lanes, <br />traffic routing, and road surfacing, methods of <br />preventing unauthorized access, locking of gates, etc. <br />(e) 1. The RDSI references the Site Development Plan; please <br />submit a copy for review. <br />(f) 1. If the disposal area is not the entire site, setback <br />areas and areas not to be used for disposal are to be <br />shown. <br />2. The plan must identify and show distances to all <br />structures (both on and off site), easements, land <br />uses, etc., within 1,000 feet of the site boundaries. <br />(g) 1. This is an overall site development plan, covering <br />identification and timing of individual phases of site <br />development. Indicate which portions of the site have <br />been developed and designated to date, and those areas <br />proposed for future use which would require permit <br />revisions. An implementation schedule should be <br />included. <br />2. Include a grading plan for the site. <br />