My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1978-1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
0
>
4400 - Solid Waste Program
>
PR0440006
>
COMPLIANCE INFO_1978-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2021 5:56:48 PM
Creation date
7/3/2020 11:06:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1978-1992
RECORD_ID
PR0440006
PE
4434
FACILITY_ID
FA0004515
FACILITY_NAME
FRENCH CAMP LANDFILL
STREET_NUMBER
0
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95231
APN
16307035
CURRENT_STATUS
02
SITE_LOCATION
MANTHEY RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440006_0 MANTHEY_1978-1992.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
635
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Padilla <br />Page 5 of 7 <br />(h) 1. The map should show pre -excavation topography and <br />as -built depths and locations of cuts, trenches, ponds, <br />etc. The final elevations should represent the <br />ultimate grading or closure plan. <br />(i) 1. Provide a description of the subsurface, including <br />cross-sections, potentiometric surface maps, and a <br />description of regional and site geology. <br />2. Show the locations of test borings on a map. The RDSI <br />states that ground water is in contact with refuse and <br />portions of the landfill. Please provide information <br />as to how this will be addressed. The method must be <br />approved by the Regional Water Quality Control Board. <br />3. Include depth to groundwater, groundwater elevation, <br />gradient and direction of groundwater flow. Please <br />provide the information from Sections 4.1 and 4.2 which <br />meet this requirement so that we may complete our <br />review. Include a hydrostratified cross-section of the <br />site, identifying the different water bearing zones, <br />how they were determined, etc. with the submittal. <br />(j) 1. Show the locations of primary drains, berms, etc., on a <br />map. <br />2. The design basis of drainage control devices is to be <br />given; this may require the determination of typical <br />runoff coefficients and runon volumes for 100 year, 24 <br />hour storm conditions. <br />(k) 1. If a leachate control system is proposed, describe its <br />length, width, depths and design characteristics. The <br />location of the system should be shown on a map. <br />2. Describe monitoring and sampling procedures. <br />3. Estimate the volume of leachate to be handled and the <br />manner of removal from the leachate collection system <br />(periodic pumping, etc.). <br />4. Indicate the manner of treatment and point of discharge <br />of treated leachate. <br />The RDSI states, "The slough on three sides of the site <br />generally provide for containment and control of <br />leachate." Provide additional information regarding <br />this "containment and control" method, such as site- <br />specific evidence that ensures the sloughs provide <br />proper containment and control of leachate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.