Laserfiche WebLink
prohibit through this permit condition the handling or disposal of solid waste to <br /> protect the public health and safety, rehabilitate, or enhance the environment, <br /> or to mitigate adverse environmental impacts. <br /> 2. Any change that would cause the design or operation of the facility not to <br /> conform to the conditions of this permit may be considered a significant change <br /> and may require a permit revision. <br /> 3. This facility has a permitted capacity of 330 tons per day and shall not to <br /> receive more than this amount without first obtaining a revised permit. <br /> 4. A change in operator will require a new permit. <br /> 5. This revision of the solid waste permit supersedes the permit originally issued <br /> on February 1, 1983. This permit has been revised as a result of the 5 year <br /> permit review, and is intended to update the previous permit. <br /> PROVISIONS <br /> 1 . This permit is subject to review by the LEA and may be modified, suspended, <br /> or revoked for sufficient cause after a hearing. <br /> 2. Safety equipment shall be used for all employees that operate equipment at this <br /> landfill. <br /> 3. This facility shall comply with the monitoring and reporting program of the <br /> RWQCB. <br /> SELF-MONITORING PROGRAM <br /> The following items shall be monitored by the operator of the facility or his agent. <br /> Records including but not limited to the following items shall be kept and made <br /> available to the LEA at intervals specified: <br /> 1. Submit tonnage records on a monthly basis to the LEA. <br /> 2. Quantities and types of materials recycled and/or salvaged shall be reported to <br /> the LEA on a quarterly basis. <br /> 3. A log of special occurrences, i.e. fires, explosions, accidents, hazardous <br /> wastes, etc., shall be maintained and reported to the LEA on an annual basis. <br /> 4. Any other information concerning the landfill must be provided to the LEA upon <br /> request. <br /> 4 <br />