My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1994_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 7:08:21 AM
Creation date
7/3/2020 11:08:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994_1
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
665
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFELDER <br /> 8 DOCUMENTATION <br /> All sampling, testing and reduction of test data shall be completely documented. <br /> Information shall be recorded on standard forms. Documentation shall include a daily iog <br /> of project activities and appropriate logs, forms, and photographs. Sample forms are <br /> presented in Appendix C. <br /> Each log shall be signed by the person who prepared it. Items to be included in the daily <br /> log, are: <br /> • Project identification (Name) • Visitors on site <br /> (Kleinfelder, Client, Agency, etc) <br /> • Project number • Contractor progress or problems <br /> • Field activity of technician • The outline of any communications <br /> • General work activity of contractor • Weather Conditions <br /> • Unusual events . Time on site <br /> • Changes to plans or specifications • Samples taken to lab <br /> Copies of the daily logs should be sent to the Chief QC Technician daily. Copies of all <br /> N construction records shall be collected weekly and maintained on-site by the Project <br /> ,_. Manager for the County. <br /> As part of field activities, a photographic record should be maintained. Photographs <br /> should be in color. Photographs should be taken of the general site layout, field <br /> equipment, completed construction elements, etc. If test pits or trenches are dug, <br /> photographs should be taken of the subsurface profiles. <br /> Each photograph should have a description which includes job number and phase, date, <br /> L technician ID number or letter and the daily photograph number. An example of this <br /> LOdesignation is 24-2345/May 10, 92/B-4. In addition, the photographs should be located on <br /> CR9-42 Page 25 of 28 <br /> Copyright 1991 Kleinfetder, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.