Laserfiche WebLink
kn KLEINFELDER <br /> PATRICK C. DELL <br /> Project Engineer <br /> Select Project Experience (continued) <br /> o Brookside Development, Stockton, California <br /> Mr. Dell is currently project engineer for this twelve-hundred acre <br /> residential/commercial project on the west side of Stockton. This project involved <br /> evaluations and strengthening of approximately four and one half miles of levees to <br /> meet FEMA requirements for One hundred year flood protection as well as grading <br /> operations involving several hundred thousand cubic yards of soil. <br /> o Forward Inc., Landfill, San Joaquin County, California <br /> Mr. Dell is project engineer responsible for construction monitoring and testing of <br /> clay liners for waste management units being constructed and closed at the site. <br /> Performed a sealed double ring infiltrometer test on a clay liner at site. <br /> G10893 (8/90) 3 <br />