My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1994_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 7:08:21 AM
Creation date
7/3/2020 11:08:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994_1
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
665
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r 1. H. KLEINFELDER & ASSOCIATES <br /> 1 <br /> File: 5-1008-21/12:337 <br /> Revised: July 8, 1986 <br /> ! - Page 4 <br /> II <br /> It is proposed that monitoring wells at the . site be <br /> circulation . air * <br /> Installed by rmeans of the casing hammer/dual tube reverse <br /> rota=y_drillinq procedure. . Advantages of this <br /> ® drilling system Include:. <br /> o Control'of potential caving sediments, since a casing <br /> is advanced as the hole is drilled; <br /> o Improved stratigraphic control, as there is a real-time <br /> return of cuttings, not diluted with side-wall slough <br /> from above; <br /> o Nater yield information is available for the interval <br /> at the bottom of the casing. <br /> o The air rotary drill rig is equipped with an apparatus <br /> which filters the air from the compressor down to one <br /> micron® <br /> WELL CONSTRUCTION- <br /> The <br /> ONSTRUCTIONThe materials proposed <br /> monitoring wells are:' for the construction of the <br /> A. Nell Casinos and Screen <br /> 1 . Approximately 120 feet to 130 feet of 4-inch <br /> diameter PVC, threaded, Schedule 40. <br /> 2 . 40-43 feet of 4-inch diameter PVC slotted screen, <br /> threaded, Schedule 40, 0®02-inch slot size. <br /> 3• A 4-inch diameter PVC top and bottom caps. , <br /> 4. Four-foot steel locking security covers. <br /> The casing and screen shall be joined by flush threaded <br /> joints• No glues or solvents will be used in joining <br /> the casing sections. <br /> S. Filter Sand/Gravel Pack <br /> The filter space shall be packed with a sand backfill <br /> to a depth two feet above the screened section. Filter <br /> pack design will be relatively compatible with the <br /> screen sizing and materials encountered. It has been <br /> determined that a2 , #3 sands are suitable and <br />
The URL can be used to link to this page
Your browser does not support the video tag.