My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1973-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3242
>
4400 - Solid Waste Program
>
PR0440068
>
COMPLIANCE INFO_1973-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2021 2:43:38 PM
Creation date
7/3/2020 11:10:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1973-2003
RECORD_ID
PR0440068
PE
4434
FACILITY_ID
FA0001871
FACILITY_NAME
CALIFORNIA CLAY LANDFILL
STREET_NUMBER
3242
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17702029
CURRENT_STATUS
02
SITE_LOCATION
3242 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440068_3242 S EL DORADO_1979-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
425
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
that operation may likely involve less than 20 days per month.) <br />Assuming a cover requirement for 5 months out of the year, <br />roughly 1000 CY of cover soil will be required for winter <br />operation. Accordingly, a stockpile of 1000 CY will be <br />maintained by Cove Contractors at the site for this purpose. <br />Because the pit is already excavated, all future cover material <br />will be obtained from off-site. This will involve import of <br />appropriate amounts of clean cover soil for daily and <br />intermediate cover for winter months only and as a contingency <br />for periods of unusually high wind that may create waste dust <br />problems. Appropriate closure cover soil will also be imported <br />for the final cover described in Section H-1.1, Final Cap and <br />Site Improvements. <br />The depth of cover for daily cover and intermediate cover during <br />winter months will be 6 inches and 12 inches, respectively. <br />However, it should be noted that the need for intermediate cover <br />is unlikely due to the relatively small size of the disposal area <br />which will require placement of subsequent waste lifts within a <br />180 day period. <br />There is no on-site scale and Cove Contractors does not propose <br />to use scales at the site. The ASW quantities disposed of will <br />be measured and recorded at the source and available to Cove <br />Contractors. <br />Comment on Section A-5 <br />RDSI neglects to identify source of imported cover material or if <br />present on site where is the borrow location. <br />Response to Comment on Section A-5 <br />The source of the borrow material is unknown because the sources <br />for borrow material will be negotiated based on availability and <br />economics of local cover. Borrow projects typically may involve <br />a variety of sources as they become available based on local <br />construction projects. <br />Comment on Section A-8 <br />RDSI makes no reference to a water truck which may be used for <br />dust control. <br />Response to Comment on Section A-8 <br />The water truck is referred to in Section A-14.4. The ASW will <br />be received at the site in a moist condition. Therefore, <br />generation of significant dust during disposal should not be a <br />E <br />
The URL can be used to link to this page
Your browser does not support the video tag.