Laserfiche WebLink
0 0 <br /> installation, landfill gas probe installation, hydroseeding, and implementation of Site security that <br /> were established in 2008. Final closure approval by the RWQCB and CalRecycle has not been <br /> received. <br /> On March 8, 2010, Miller Brooks submitted the Feasibility Study (FS) for the Site to the RWQCB. A <br /> portion of the FS discussed installing additional monitoring wells on- and off-Site to further define <br /> the horizontal extent of groundwater contamination. The addition of the monitoring wells was <br /> approved by the RWQCB in their letter dated May 27, 2010. Therefore, this SHSP addresses the <br /> installation of the additional groundwater monitoring wells. <br /> 1.3 PURPOSE AND OBJECTIVE <br /> As mentioned above, this SHSP addresses the installation of additional groundwater monitoring <br /> wells. The proposed installation includes two on-Site monitoring wells, MW-12 and MW-13 (See <br /> Figure 2), and depending on the access granted by Union Pacific Railroad there will be a <br /> potential of installing two or three off-Site monitoring wells. <br /> This SHSP was prepared to meet the requirements of 29 CFR Part 1910.120, 8 CCR 5192, <br /> applicable state requirements, the EPA Standard Operating Safety Guides for Hazardous Waste <br /> Operations (1986), and the Miller Brooks Environmental Comprehensive Safety and Health <br /> Program. This SHSP was prepared from the best available evidence concerning Site conditions. <br /> It is recognized that conditions on a Site may change or that more information may become <br /> available during the operation. Unless specified in this SHSP, the field team does not have the <br /> option to modify the levels of personal protection in any way. If during the operation, it is <br /> determined that the protection specified in the Site-specific safety plan requires modifications, <br /> work will cease, and the site safety officer (SSO) will contact the project manager and/or Safety <br /> Representative. Work will not resume until authorized. <br /> This SHSP will be included as an appendix to the Monitoring Well Installation Workplan. The <br /> associated tasks include: <br /> • Installation of two on-Site monitoring wells and two additional, off-Site monitoring wells. <br /> • Groundwater sampling and monitoring. <br /> 2 A ALLEN HAFOOKAV <br /> P:\707 Cove Contractors\Groundwater\Well Installation Workplans\SHSP\SHSP_FINAL.doc <br />