My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3242
>
4400 - Solid Waste Program
>
PR0440068
>
COMPLIANCE INFO_2008-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2021 10:05:03 AM
Creation date
7/3/2020 11:10:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2017
RECORD_ID
PR0440068
PE
4434
FACILITY_ID
FA0001871
FACILITY_NAME
CALIFORNIA CLAY LANDFILL
STREET_NUMBER
3242
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17702029
CURRENT_STATUS
02
SITE_LOCATION
3242 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440068_3242 S EL DORADO_2008-2017.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> 4.2 SITE SPECIFIC TRAINING <br /> 4.2.1 PRE-ENTRY/TAIL GATE MEETINGS <br /> All field personnel will review the SHSP prior to field activities. A tail-gate meeting will be <br /> conducted with all field personnel identifying the field objectives and potential field hazards <br /> each day prior to commencement of such activities. After review of the SHSP procedures, <br /> including route to nearest hospital, all field personnel will be required to sign the tail-gate safety <br /> form. <br /> The Site Health and Safety Plan Review Record is provided in Appendix A. The Tail Gate Health <br /> and Safety Briefing Log is provided in Appendix B. <br /> 4.2.2 RAILROAD SAFETY TRAINING <br /> The Site Manager will coordinate with Union Pacific Railroad Company safety personnel to insure <br /> that the contents of this SHSP meet or exceed the requirements of the Union Pacific Railroad <br /> Company. All field personnel will review and familiarize themselves with any additional safety <br /> information or requirements provided by the Union Pacific Railroad Company prior to field <br /> activities. <br /> 14 <br /> ELLER 8 XS' <br /> P:\707 Cove Contractors\Groundwater\Well Installation Workplans\SHSP\SHSP_FINAL.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.