Laserfiche WebLink
KLE/MFEL®ER <br /> Bright People.Right Solutiom <br /> Environmental Impacts <br /> Sewer Services <br /> The City of Stockton currently provides sewage treatment and collection services to the <br /> project area. The existing 6-inch public sanitary sewer line in F Street will be <br /> abandoned along with the proposed abandonment of F Street. The line in F Street will <br /> be on private property and included in on site planning of the project. <br /> The proposed project would involve an increase in sewage generation at the site. The <br /> ODS shall submit sewer background documentation along with calculations and a <br /> Waste Discharge Permit, if needed, to the Municipal Utilities Department as required by <br /> the mitigation below. The project site is currently designated for industrial use and has <br /> been subject to such uses in the past. The existing lines serving the site are sized to <br /> handle potential industrial development of the area. <br /> Level of Significance: Potentially significant <br /> Mitigation Measures: <br /> 1. The ODS shall submit sewer background documentation along with <br /> calculations to the Municipal Utilities Department in conjunction with building <br /> permit applications. A Waste Discharge Permit will also be obtained, if <br /> required. <br /> Significance after Mitigation: Less than significant. <br /> Implementation: The ODS will be responsible to provide sewer background <br /> documentation and calculations to the Municipal Utilities Department. If a Waste <br /> Discharge Permit is required, the ODS shall make application for such Permit to <br /> the Municipal Utilities Department. <br /> Monitoring: The Municipal Utilities Department will be responsible for review and <br /> approval of documentation and calculations. <br /> Water Services <br /> Water service in the project area is provided by CalWater. CalWater has indicated that <br /> sufficient water supplies are available to serve the project. Existing water lines in the <br /> area have been sized to adequately serve the project; and no significant impacts on <br /> water services are anticipated. <br /> Level of Significance: Less than significant <br /> 121339/ST011 R226 3-64 October 14, 2011 <br /> Copyright 2011 Kleinfelder <br />