Laserfiche WebLink
Item No. 2 <br /> PC: 12-16-93 <br /> ER-93-1/UP-93-4 <br /> Page 17 <br /> Construction of fills,foundations,slabs, and roadways on the site shall be in accordance <br /> with the geotechnical recommendations contained in Appendix F of the Final EIR. <br /> C.4. Potential) Si erosion. <br /> lm act: Construction of the ro osed ro ect facilities would rom <br /> surface soil erosion. ate <br /> Fin. dina <br /> Changes Or alterations have been required in, or incorporated into, the project which avoidr <br /> substantially lessen the significant environmental effect as identified in the Final EIR. o <br /> Statement of Fact: <br /> This impact will be reduced by the following:. <br /> • Place plastic sheeting, debris fences, silt fences, and/or hay bales to protect disturbed <br /> surfaces during storms during construction. Following construction, all disturbed <br /> surfaces, especially slopes, shall be revegetated. <br /> D. WATER RESOURCES <br /> D.1. Potential) Si nificant Im act: Surface water contamination <br /> waters or storm waters that have become contaminated, ma occur from discharge of surface t <br /> Findino: . <br /> Changes or alterations have been required in, or incorporated into, the project which avoid or <br /> substantially lessen the significant environmental effect as identified in the Final EIR. <br /> Statement of Fact: <br /> This impact will be reduced by the following: <br /> Construct on-site drainage, as proposed. <br /> The evaporation/collection pond for surface runoff from the active working area (the yard <br /> and wood waste area) shall be lined. <br /> All surface areas involved in the transportation, processing,or storage of wastes shall be <br /> paved or lined and drained to an appropriate catchment facility to prevent contaminated <br /> runoff from entering the surface and ground water. <br /> The proposed receiving and processing operations shall take place within covered and <br /> paved structures. The outdoor wood and yard waste composting area shall be paved or <br /> lined. Except for yard and wood waste,there shall be no direct precipitation onto wastes <br /> and no contamination of surface water. All buildings shall be constructed so that storm <br /> runoff shall not enter and come into contact with waste or recovered materials. <br />