Laserfiche WebLink
BlaeS Environmental Management Lic U Haul#709-50 <br /> 002-70950-03 Work Plan <br /> 11/8/01 <br /> and/or pumping each well until relatively clear water can be purged from the well at various depths <br /> Blaes Environmental will record well installation activities including final well construction details and <br /> well development procedures using forms included in Appendix A Purged groundwater will be stored in <br /> an on-site 1,000-gallon polyethylene tank pending waste profiling and disposal <br /> 3 2 PLANNED GROUNDWATER MONITORING AND SAMPLING PROGRAM <br /> The groundwater monitoring program will include sampling all well casings associated with the site on a <br /> quarterly basis through 2002 With the addition of three new monitor wells, the number of possible <br /> casings to monitor and sample will be 26 Due to the number of wells, groundwater monitoring and <br /> sampling will be performed over a three to four day period The groundwater sampling program will <br /> consist of six tasks including I) measuring the depth to static groundwater, 2) measuring the dissolved- <br /> oxygen level, 3) purging approximately three casing volumes of water prior to sample collection, <br /> 4) groundwater sample collection, 5) analyzing the groundwater sample at an analytical laboratory, and <br /> 6)preparing a quarterly report detailing the findings <br /> 32 1 Groundwater Monitoring <br /> The depth to groundwater at each monitor well will be measured from a reference point (a permanent <br /> mark on the top of the uncapped PVC well casing) The depth to groundwater measurements will be to <br /> the nearest 0 01-foot using a Solonist®water level indicator The interface probe will be decontaminated <br /> prior to and after use at each well with a liquid Alconox® detergent wash, a tap water rinse, and a final <br /> rinse with deionized water Water level depth and time of measurements will be recorded on a standard <br /> field data sheet(Appendix A) <br /> In addition to depth to water measurements, Blaes Environmental will collect a dissolved-oxygen level <br /> measurement at each monitor well using the YSI-85 dissolved-oxygen probe The probe will also be <br /> decontaminated between measurements The dissolved oxygen level measurements will be recorded on a <br /> field data sheet and performed in accordance with the groundwater monitoring procedures (Appendix B) <br /> 3 2 2 Groundwater Puruing <br /> Groundwater sampling at the site will include sample collection from all possible well casings This will <br /> include the upper "A", middle "B", and Iower "C" well casings The proposed new wells will have a <br /> 11 <br />