My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007154
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2701
>
3500 - Local Oversight Program
>
PR0540315
>
ARCHIVED REPORTS_XR0007154
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 3:05:51 PM
Creation date
7/7/2020 2:23:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007154
RECORD_ID
PR0540315
PE
3526
FACILITY_ID
FA0023046
FACILITY_NAME
U-HAUL FACILITY NO 710050
STREET_NUMBER
2701
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95215
APN
11708014
CURRENT_STATUS
01
SITE_LOCATION
2701 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BIaBs Environmental Management Inc U-Haul#709-50 <br /> 002-70950-03 Groundwater Monitoring Report <br /> 10/22/01 <br /> 1) The vertical and lateral extent of petroleum contamination is not defined and further <br /> investigation is required <br /> 2) A work plan for future investigation of the vertical and lateral delineation of hydrocarbon <br /> impact and proposed remedial testing is due to the SJC within 60 days of the letter date <br /> 3) Upon completion of remedial testing and further investigation activities, a corrective <br /> action plan is required for submittal <br /> 4) A schedule of planned activities and proposed task completion dates <br /> Following completion of this groundwater monitoring event and pursuant to a directive from the SJC, <br /> Amerco/U-Haul will begin remedial feasibility testing at the site <br /> 14 PROGRAM OBJECTIVES <br /> The objective of the quarterly groundwater monitoring program was to provide additional data <br /> (monitoring and analytical data) to further evaluate groundwater conditions beneath the site <br /> 15 SCOPE OF WORK <br /> The current quarterly monitoring event was conducted in September 2001 The monitoring event <br /> involved the following tasks 1) collecting field measurements of groundwater conditions from all of the <br /> well casings in each of the well locations, 2) purging monitoring wells prior to collecting groundwater <br /> samples, 3) storing and profiling purged groundwater for disposal/treatment, 4) analyzing groundwater <br /> samples, and 5)preparation of this report <br /> 1 b PROJECT TEAM <br /> The project team consisted of Blaes Environmental of Phoenix, Arizona and Del Mar Analytical, Inc <br /> (Del Mar), a California State certified analytical laboratory located in Irvine, California Blaes <br /> Environmental coordinated and managed the project, performed field measurements, collected, sealed and <br /> arranged for proper transport of the groundwater samples to the analytical laboratory, and prepared this <br /> report Del Mar provided sample containers and laboratory analysis of groundwater samples collected at <br /> the site <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.