My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
101
>
2900 - Site Mitigation Program
>
PR0541653
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2020 3:44:55 PM
Creation date
7/8/2020 3:37:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0541653
PE
2965
FACILITY_ID
FA0023871
FACILITY_NAME
TOP FILLING STATION
STREET_NUMBER
101
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15125307
CURRENT_STATUS
01
SITE_LOCATION
101 S WILSON WAY
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
30 October 1995 <br /> AGE-NC Proposal No. 1094 <br /> Page 2 of 4 <br /> AGE will perform the following tasks: <br /> • Supervision of UST removal procedures. <br /> • Collection of one (1) soil sample from the UST excavation and one (I) soil sample from <br /> stockpiled soil (if necessary). <br /> • Analysis of soil samples for total petroleum hydrocarbons quantified as gasoline and diesel <br /> (TPH-g and TPH-d) and volatile aromatics (benzene, toluene, ethyl benzene and xylene: <br /> BTE&3) in accordance with the appropriate EPA methods. <br /> • Prepare a summary report of the UST removal. The reportwill include recommendations for <br /> further work, if necessary. <br /> • Post UST removal liaison with regulatory agencies. <br /> 3.0. COST <br /> The cost for the above services should not exceed $1,550.00. This cost is based upon the scope of <br /> work discussed above and on our Standard Schedule of Charges. AGE shall submit detailed monthly <br /> invoices to TOP FILLING STATION for payment. <br /> 4.0. PAYMENT SCHEDULE <br /> Invoices will specify the actual costs incurred during the billing period. The invoices will detail when <br /> the services were performed, a breakdown for direct labor, indirect costs, travel, equipment, materials <br /> and supplies, and subcontractor services. All services performed by Goins Environmental <br /> Construction will be invoiced directly to the Client. Based upon estimated costs provided by GEC <br /> and AGE, the total cost for removal and sampling of the UST should not exceed $5,750.00. <br /> 5.0. COSTS NOT INCLUDED IN THIS PROPOSAL <br /> • Additional sampling and/or analysis, if necessary. <br /> • Disposal of contaminated soil and/or ground water, if necessary. <br /> • Other costs not specifically stated in this proposal. <br /> -t 1Y•I'++• IA•S5:{. n..-..vim .'S 'is....: .<. ...6 R. .:.fl.. .._ J... v: s\•. ...'.. '.5:.. ....... .. : <br />
The URL can be used to link to this page
Your browser does not support the video tag.