My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011934
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
101
>
2900 - Site Mitigation Program
>
PR0541653
>
ARCHIVED REPORTS_XR0011934
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2020 4:05:21 AM
Creation date
7/9/2020 8:23:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011934
RECORD_ID
PR0541653
PE
2965
FACILITY_ID
FA0023871
FACILITY_NAME
TOP FILLING STATION
STREET_NUMBER
101
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15125307
CURRENT_STATUS
01
SITE_LOCATION
101 S WILSON WAY
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I12 July 2006 <br /> . AGE-NC Project No 95-0130 <br />' Page 7 of 14 <br /> MTBE was detected in the March 2006 influent SVE air flow sample at a concentration of 10 µg11, <br />' MTBE was not detected in any of the above effluent air flow samples <br /> Analytical results of SVE air samples are summarized in Table 5 GeoTracker confirmation pages <br />' of the submitted laboratory electronic deliverable format (EDF) files are included in Appendix C <br /> A plot of laboratory analysis of SVE influent TPH-g air stream concentrations versus time is <br />' included with Appendix E The laboratory reports (CTEL Project Nos 0601-020, 0602-052 and <br /> 0603-083) and chain of custody forms are presented in Appendix F <br />' 3 3 3 MASS CALCULATION OF RECOVERED PRODUCT <br /> The hydrocarbon mass removed during the SVE operating period was calculated using the equation <br /> M= C•Q•t <br /> I where M =cumulative mass recovered (kg) <br /> C = vapor concentration (kg/m3) <br /> Q= extraction flow rate (m3/hr) <br /> lie t= operational period, in hours <br /> Between 07 December 2005 and 14 March 2006, the SVE unit operated a total of 2,243 hours <br /> (Table 6) The average analytical results (approximately 1,567µg/1) of the influent SVE air flow <br /> samples (Table 5), average diluted SVE influent flow rates (approximately 90 scfm, Table 6) and <br /> the operational period (2,243 hours) were used to calculate the approximate mass of extracted <br /> gasoline during this period <br /> During the first quarter 2006 operational period, the mass of hydrocarbons extracted by the SVE <br /> system was calculated to be approximately 1,178 pounds, or equivalent to a volume of 188 gallons <br /> of gasoline Added to the estimated 2,710 gallons of hydrocarbons extracted from the SVE system <br /> since 31 August 2004 (start-up), the total volume of hydrocarbons extracted to date is estimated at <br /> 2,898 gallons (Table 7) A plot of the cumulative mass (pounds) of hydrocarbons extracted to date <br /> is included in Appendix E, the volume/mass calculations for extracted hydrocarbons are included <br /> with Appendix G <br /> I4.0 INTERIM GROUND WATER EXTRACTION REMEDIATION <br /> Between 06 December 2005 and 14 March 2006, interim remediation ground water P&T system <br /> was continuously operated at the site The ground water treatment operation and maintenance <br /> procedures for the site were outlined in AGE's Interim Remediation Work Plan - May 2003, dated <br /> IAdvanced Gcohnvironmental,inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.