Laserfiche WebLink
Hazardous Waste Contingency Plan <br /> Description <br /> Personnel Protective Located with each Safety glasses to ensure foreign objects and materials <br /> Equipment ( PPE ) spill kit do not penetrate eyes . <br /> • Nitrile gloves to ensure materials do not come in <br /> contact with skin . <br /> Eye Wash Stations (5) HHMA CSA, and Eye wash stations flush eyes of contaminates, <br /> East , Southeast, primarily for contact with corrosives . <br /> South , Southwest and I <br /> North areas of the <br /> building <br /> 8 EVACUATION PLAN <br /> If a fire , explosion , or hazardous release occurs , evacuation may be necessary . The Emergency <br /> Coordinator will decide whether an evacuation is necessary . The Site ' s PA system will be used to <br /> announce an evacuation to all personnel . The fire alarm pull box can also be used to initiate an <br /> evacuation . <br /> Evacuation routes are shown on Figure 2 . An emergency exit is located south of the HHMA CSA . <br /> Additional exits are located around the perimeter of the building . During an emergency , use the <br /> nearest exit . If blocked , utilize the next closest exit . Upon evacuating , associates should report to <br /> one of the three designated evacuation meeting areas . The meeting area closest to the HHMA CSA <br /> is located at the south , outside the building . The other meeting areas are located on the north and <br /> northeast sides . A headcount will be performed by the General Manager or senior person in charge <br /> within each group . If it is necessary for personnel to leave the Site , they must notify the person in <br /> charge . If the meeting area must be vacated , it will be moved upwind of the incident . The exact <br /> location will be communicated by the Emergency Coordinator, or alternate , via cell phone . <br /> 9 EMERGENCY PROCEDURES <br /> The Hazardous Waste Contingency Plan will be implemented under the following conditions : <br /> • A fire involving hazardous waste <br /> • An explosion involving hazardous waste <br /> • A release or spill involving a reportable quantity ( RQ ) of hazardous waste <br /> Upon discovery , spills or releases that do not exceed an RQ will be cleaned up and properly <br /> managed , but will not require implementation of the hazardous waste contingency plan . The RQs for <br /> the potential hazardous wastes are identified in 40 CFR Part 302 , Table 302 . 4 . <br /> The Emergency Coordinator will have the discretion to implement the Plan based on the conditions of <br /> an emergency situation . <br /> The provisions of the Plan must be carried out immediately whenever there is a fire , explosion , or <br /> release of hazardous waste or hazardous waste constituents that could threaten human health or the <br /> environment . A spill of hazardous waste less than the RQ could potentially trigger either of these <br /> conditions . <br /> I <br /> arcadis . com 11 <br /> I� <br />