Laserfiche WebLink
all the soil samples will be recorded The soil sample that registers the highest concentration of organic <br /> 1 �a ,,, <br /> vapors in each borehole will normally be submitted for laboratory analysis. In the event that <br /> 10 <br /> air �l� Ss <br /> significant level of organic vapors is detected during sampling of the entire borehole, the soil sample <br /> retrieved from the interval directly above the groundwater saturated zone will normally be selected for <br /> laboratory analysis Other samples may also be submitted for analysis as described m the workplan <br /> The soil samples submitted for analysis will be transferred to laboratory-prepared containers and will , <br /> be submitted for laboratory analysis The analytical laboratory performing the analysts will possess any <br /> required regulatory agency certification A chain-of-custody record will be maintained for all the <br /> laboratory soil samples-throughout-the sampling-effort and laboratory analysts---------- <br /> Selected <br /> nalysts - `------__Selected samples may be submitted for physical analysis and for inorganic analysis to characterize the , <br /> size distribution, mineralogy, engineering, and geochemical properties of the particles Selected soil <br /> samples may also be sent to the Du Pont laboratory for in-situ biotreatment feasibility evaluation. <br /> Drilling and sampling equipment decontamination procedures will be followed to prevent cross <br /> contamination between borings and sampling intervals The drilling rig and all associated drilling <br /> equipment will be steam cleaned prior to the first boring and between each boring The split spoon <br /> sampler will be decontaminated after each sampling interval with a biodegradable deterkent scrub, <br /> potable water rinse, and a minimum of two rinses with distilled water Each boring will be grouted by <br /> tremae pipe with a cement/bentonite mixture to seal the borehole <br /> A-2 Monitoring Well Installation <br /> completion <br /> U on of the discrete soil sampling task, monitoring wells will be constructed in selected <br /> Pp g <br /> boreholes according to the geology logged A Du Pont geologist will inspect all monitoring well ' <br /> construction materials and will supervise monitoring well installation <br /> Monitoring wells will be constructed of threaded flush point, schedule 40 PVC screen and riser pipe of <br /> the specified diameter No glue or solvents will be used Factory slotted screen will be used The <br /> water level in the borings will dictate the depth of screen placement The monitoring wells will be <br /> sufficiently screened above the water table to allow the entry of lighter-than-water petroleum hydrocar- <br /> bon fuel's, if piesent-, and allow foc seasonal water elevation fluctuations Only one water-bearing unit <br /> will be intersected by the well screen of each monitoring well <br /> The annular space between the PVC well casing and the borehole will be gravel packed with a gravel <br /> -- - appropriate for the slot size of the screen The annular space will-be gravel packed to a height at least <br /> 2 feet above the top of the screen A 1- to 3-foot bentonite seal will be emplaced above the,gravel <br /> pack to prevent the direct infiltration of run-off or cement into the annular space The remainder of <br /> the annulus will be grouted by tremie pipe with a cement/bentonite mixture to the ground surface, In <br /> areas of low traffic, the monitoring wells will be completed two feet above grade and aK eel prptective <br /> 11 - " A <br /> 4005111 Rev o Du Pont Environmental Remediation Services A-2 <br /> T Pnnted on Recycled Paper <br /> 3 <br />