My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012653
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2537
>
3500 - Local Oversight Program
>
PR0545857
>
ARCHIVED REPORTS_XR0012653
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:21:20 PM
Creation date
7/15/2020 2:47:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012653
RECORD_ID
PR0545857
PE
3528
FACILITY_ID
FA0005147
FACILITY_NAME
E-Z FOOD
STREET_NUMBER
2537
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
11914035
CURRENT_STATUS
02
SITE_LOCATION
2537 WATERLOO RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nr� <br /> i <br /> 9 <br /> of flow to the northwest. Local ground water characteristics could vary frothese historical <br /> m <br /> maps at the time of drilling. <br /> PROPOSED`YORK <br /> This proposed investigation is designed to assess the presence of hydrocarbon <br /> contamination in soil and ground water beneath the site. The following tasks are proposed <br /> and discussed in the following sections. <br /> o Acquire permits from the San Joaquin Local Health Department. <br /> a Site Safety Plan prepared by a licensed contractor authorized to perform the <br /> scope of work. <br /> o Drili three soil borings at the approximate locations shown on Plate P-1 to <br /> approximately 44 feet below grade or 2 to 5 feet below the bottom of the <br /> uppermost water bearing unit. Borings will be drilled using 8-10 inch outer <br /> r <br /> diameter hollow stem augers. <br /> o Collect and classify relati%ely undisturbed soil samples continuously within the <br /> first soil boring drilled and every five (5) feet in the remaining two soil <br /> borings drilled. <br /> o Screen soil samples in the field using an (HN1.1) 101 Photoionization Meter <br /> and record all readings. <br /> o Construct three ground water monitoring wells using thread jointed, 4-inch <br /> inside diameter,Schedule 40 polyvinyl chloride(PVC)casing in the borehole. <br /> o Develop and purge the wells and collect ground water samples. <br /> o Analyze selected soil and ground water samples for hydrocarbons in a <br /> laboratory certified by the State of California. <br /> o Contract a licensed land surveyor to survey the location, ground surface <br /> elevation and the top of casing elevation for each well. <br />
The URL can be used to link to this page
Your browser does not support the video tag.