My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012653
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2537
>
3500 - Local Oversight Program
>
PR0545857
>
ARCHIVED REPORTS_XR0012653
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:21:20 PM
Creation date
7/15/2020 2:47:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012653
RECORD_ID
PR0545857
PE
3528
FACILITY_ID
FA0005147
FACILITY_NAME
E-Z FOOD
STREET_NUMBER
2537
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
11914035
CURRENT_STATUS
02
SITE_LOCATION
2537 WATERLOO RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMEMO" <br /> :s <br /> M - <br /> 4 - <br /> o Elevate ground water now direction and ground writer gradient beneath the <br /> site. <br /> o Interpret field and laboratory data to assess the extent of sail and ground <br /> water contamination, <br /> o Drill additional soil borings and install monitoring wells, if necessary to <br /> elevate the extent of contamination. <br /> o Prepare a Problem Assessment Report summarizing field and laboratory <br /> procedures, local geology, hydrogeology, and water use, and present the <br /> findings, interpretations, and conclusions to the 1-lealth Department for <br /> review. <br /> This work will be conducted to comply with ground water assessment guidelines of <br /> the San.Joaquin County Public Health Services and guidelines prepared by the Tri-Regional <br /> Water Quality Control Board. <br /> SAFETY PLAN <br /> Field work will be performed at the site in accordance with a site safety plan <br /> developed by a licensed contractor authorized to perform the scope of work outlined in this <br /> work plan specifically for the site conditions. Personnel working on-site will be briefed on <br /> the contents of the safety plan. A copy of the Site Safety Plan will be kept at the work site <br /> and will be available for reference by appropriate parties during the work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.