My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012653
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2537
>
3500 - Local Oversight Program
>
PR0545857
>
ARCHIVED REPORTS_XR0012653
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:21:20 PM
Creation date
7/15/2020 2:47:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012653
RECORD_ID
PR0545857
PE
3528
FACILITY_ID
FA0005147
FACILITY_NAME
E-Z FOOD
STREET_NUMBER
2537
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
11914035
CURRENT_STATUS
02
SITE_LOCATION
2537 WATERLOO RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br /> Solt ] ORINGISAMPLING <br /> The soil borings \vcll be chilled using 8-10 inch diameter, continuous flight, hollow <br /> stc,uti auger and a Mobile 13-61, or similar, drill rig. Auger flights will be steam cleaned <br /> with Alconox and deionized water prior to and between drilling to minimize the possibility <br /> of cross-contamination. Drilling will be performed under the guidance of a field geologist <br /> and the earth materials in the borings will he logged as drilled. During drilling,soil samples <br /> will be collected continuously within the first soil boring drilled and every five(5)feet in the <br /> remaining two soil borings drilled. Soil samples will be retrieved using a California-modified <br /> split-spoon sampler equipped with laboratory cleaned brass slaeves and a five foot barrel <br /> sampler. Continuous sampling will assist the geologist in evaluating the subsurface geology <br /> and provide technical guidance for monitoring well screen placement. Samples will be <br /> collected by advancing the boring to a point just above the sampling depth,then driving the <br /> sampler into the native soil through the hollow center of the auger. The sampler will be <br /> driven 18-inches with a standard 140-pound hammer dropped 30 inches. The number of <br /> blows required to drive the sampler each successive 6-inches will be counted and recorded <br /> to give an indication of soil consistency. <br /> A representative sample from each sample interval will be tested with a HNU 101 <br /> photoionization meter. Screening will be performed by positioning the HNU probe <br /> approximately 1-inch from the fresh surface of each sediment tube recovered during <br /> sampling. The HNU reading will be obtained promptly after removal of the samples from <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.