My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008470
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3300
>
3500 - Local Oversight Program
>
PR0545858
>
ARCHIVED REPORTS_XR0008470
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 8:40:16 PM
Creation date
7/15/2020 3:25:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008470
RECORD_ID
PR0545858
PE
3528
FACILITY_ID
FA0003600
FACILITY_NAME
Nella Oil #427
STREET_NUMBER
3300
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
3300 Waterloo Rd
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> s u <br /> May 10, 1987 AGS 86103-2 <br /> ' Cardlock Station #27 - Stockton, California <br /> �r <br /> One soil boring was drilled immediately west of the product <br /> dispensers, a location inferred to be up gradient from the <br /> product storage tank cavity on the basis of information supplied <br /> }. by the San Joaquin Local Health District. MW-1 was installed in <br /> this boring. Two soil borings were drilled immediately to the <br /> east of, and adjacent to, the gasoline storage tank cavity, and <br /> � T were converted into monitoring wells MW-2 and MW-3. Two shallow <br /> y soil borings were drilled immediately adjacent to the faulty <br /> product storage tank in order to sample native soil immediately <br /> below the tank backfill material. <br /> T F <br /> Monitoring well MW-4 was installed on April 10, 1987 in a <br /> location determined to be down-gradient from the tank cavity on <br /> - the basis of data obtained from the previous wells. Locations of <br /> the wells and borings are shown on the Generalized Site Plan. <br /> The equipment used for the borings was a Mobile 8-61 drilling rig <br /> t� <br /> - � operated by Datum Exploration, Inc. , of Pittsburg, California and <br /> ' }Y <br /> equipped with 7 .5 inch and 10 inch diameter hollow stem augers. <br /> The augers were steam--cleaned prior to use and between borings in <br /> order to minimize the possibility of cross-hole contamination. <br /> �s <br /> .i The total depth of drilling was approximately fib feet for borings <br /> , < <br /> B-1 and H-3, 60. 5 feet for boring B-2, and 61 feet for boring <br /> rte.. <br /> �p <br /> 3 - <br /> BQ010994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.