My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BOEING
>
2518
>
2200 - Hazardous Waste Program
>
PR0538472
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 1:41:04 PM
Creation date
7/22/2020 2:11:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0538472
PE
2220
FACILITY_ID
FA0014398
FACILITY_NAME
QUEST INDUSTRIES LLC
STREET_NUMBER
2518
Direction
E
STREET_NAME
BOEING
STREET_TYPE
WAY
City
STOCKTON
Zip
95206-3937
CURRENT_STATUS
01
SITE_LOCATION
2518 E BOEING WAY
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cisco elf Sy -te WORK ORDER INSPECTION SHEET <br /> Carr�reaisrdttJr#a/utfSnsJl t�1�T� 24 NI't.EMERGENCY SERVICE )Ingersoll Rand' <br /> Date of inspection 207671711 h7dustrralTechnolocgies <br /> 46 <br /> Customer Name Make <br /> Dares: <br /> Que t Industries <br /> Cl <br /> stomelModel# <br /> 7ddress 2518 Boeing Wa SexYtoe�?an <br /> Customer Contact Be—nny Garcia Serial# — Service Call ; <br /> W-0-# $R246464 Star U <br /> GIS Fixed/Changed/Cleaned/ ebuilt Dud Visit <br /> ° ° • • '' •' <br /> - -- Fixed i Chan ed I Cleaned 1 Rebuilt DuringVsit <br /> S#iii Re uires,Ra air�G;�i an in �f.�G#eanln �; <br /> 1 Fill Out Oran a Card-Re lace if Necessa S#ill R°wires R '�1ir IiGfiaft In /GJe&tang�'"-' <br /> 2 /' Run Mrs 1254 Load Hrs 40 = r 1st Stage Dischar eTem erFrture Fuil Load <br /> 3 `Full Load Pkq.Dfsch rga Temperature 41 `" I/C Press. Loaded Unloaded <br /> 4 Full Load Airend Discharge Temperature 186 42 �' Oil'Pressure Oil Tern <br /> 5 ✓"' , Full Load Coolant In' ction Tem erature 1gg 43 '' 1 2nd Stage InletTemperature <br /> 44 n 2nd Stage Discharge Temperature <br /> 6 Tar et Press: 16o Load/Unload 4g s <br /> 7 ;Unloaded inlet Vacuum <br /> Auto Sto 116 Immed.St 120 46 Inspect and Clean.Gearcase Breather <br /> 6 Sump Pressure .• ;'.mg <br /> _ <br /> 9 Inlet Filter Condition <br /> 10 s=PDM Filter Condition 47 Volta'e ' + n L4 `. " kt 1 3 iTi L2 O'`t:3=G <br /> 11 <Check Coolant Level g A 477 t 480 G " 480 <br /> 12 '.. Inspect for Coolant Leaks Full Load D F <br /> 13 Coolant Filter 48 VaItage <br /> 14 Full Load Separator ressure Drop 49 0 o Load '77 <br /> , <br /> 15 Inspect and Clean Saw,Orif/Screen T7 2 'd'3!W <br /> 16 Room Ambient Tempe rature 51 0 r1/t1 3 3NV: <br /> 17 Thermostatic Control.Valve Tem erature 51 Drop a <br /> 18 Ports: A g 52 fi-' AL2 ' L3 <br /> 19 C D 8 <br /> „Inspect forAir Leaks 53 an a or <br /> 20 Inspect/Clean All Air Cooled Coolers 54 • , ; R Mt; S F <br /> 21 Inspect/Clean Conden ate Drains '- rather., <br /> 22 ` Inspect Hall Effect Se sors 55` r =_Inspect Contactors _ A:°' <br /> 23 - Inspect&Clean Main and Blower Motors 56`_s Ck Electrical Conn. <br /> 24 ' Grease Main and Fan Motor <br /> 57 � ����'Control Volta ei.", <br /> 25 WC O/C T P 58 r ° • _ ., , <br /> 26 WC AIC T P - DC Bus Voltage(Full Load) 641 <br /> 27 = Safety Valve installed and O erational 59 '� Package Kw 31 <br /> 28 60€' , Motor Speed(Max) 1136 <br /> Dryer Condensor and Drain Dew Point 61 <br /> 29 x Inspect Inlet Valve Motor V.(Max Speed&Target P.) Iso <br /> 3062`< Motor A,(Max Speed&Tar et i�. 113 <br /> Inspect Discharge CN,and/or MPV 63`. Rotor Clearan <br /> 31 = Inspect Blowdown Valvece <br /> 32 Coupling(Or Belts)Co idition � r ° <br /> 33 <br /> Inspect All Hoses r �(IRVNABSR?iAe 1 Sta e 2 sage MOT <br /> 34 A r1 <br /> ;Inspect OWS �` mss,°% x4 mmr2 I m1 I m2 h Im1 h m2 DE <br /> 64 Loaded <br /> 35 :, Inspect Coalescing <br /> r ® a 65 dBmtuLoaded <br /> dBc <br /> ' ' ' ► 66 Loaded d61 <br /> 36 `CoolarltType <br /> IE, pIL' FtE b 1 rn1 I m2 m2 ODE <br /> 37 r r Hours on Coolant '- mbr h m1 h <br /> 67 <br /> 38 Loaded dBm <br /> Coolant Sample TakE:n Yes 68 Loaded dBc <br /> 39 Acid Test Performed Yes 69 Loaded dBi <br /> • <br /> Install and start rental, checked fa rotation, checked voltage,vvired to power from other compressor, ran and test, <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.