Laserfiche WebLink
Mr. Mike Infurna <br /> Page 2 of 2 <br /> • Water supply wells within 2,000 feet of the Site are not likely to be directly impacted by a delay in <br /> the pilot test. The water supply well locations are summarized in Table 3 and shown in Figure 5. <br /> o The Frontier Motel water supply well has been destroyed. <br /> o The Precision Fence Company Well (Well identified as C on Figure 5) located at 2619 N. <br /> Wilson Way was tested on March 31, 2004 and no constituents of concern were detected. <br /> Analytical results from the Fence Company Well are summarized in Table 4. <br /> o Wells identified as B and D on Figure 5 are upgradient of the Site. <br /> o The remaining water supply wells that are located downgradient of the Site are more than.800 <br /> feet from the Site. <br /> o The supply wells are at such a distance that a delay would not likely adversely affect the public. <br /> Respectfully, OXAAL GF00 <br /> Ground Zero Analysis, Inc. <br /> Eric L. Price <br /> Professional Geologist No. 8414 �Op CA <br /> Registered Environmental Assessor I No. 8242 <br /> Attachments <br /> cc: Mr. and Mrs. John Ferraiolo <br /> Mr. James L.L. Barton, CA Regional Water Quality Control Board <br /> Ms. Marla Nahorn, Environmental Closures <br /> I� <br /> i <br /> i <br /> I <br /> G:\GROUNDZE\HARRYS AUTO\Reports\Other Reports\090415 Technical Justification to Delay Pilot Test.doc <br />