Laserfiche WebLink
• Grudfos pump will be replaced with a 7 5 hp circulation pump The new <br /> pump will require a larger motor starter and wiring The remainder of t h e <br /> NEEP system will stay the same <br /> One additional GAC unit will be installed (Figure 13), for a total of four <br /> 2,000 pound GAC units This fourth GAC vessel will allow for the <br /> necessary additional retention time <br /> ASE will likely need to modify its City of Manteca Discharge Permit to <br /> allow for a greater volume of treated water into the sewer system <br /> 6 Other Relevant Information <br /> 6 6 1 Permits <br /> Permits to install the air-sparge and vapor-extraction wells will b e <br /> obtained from the San Joaquin County PHS-EHD Construction permits ie <br /> grading, plumbing, electrical, and mechanical permits will be obtained <br /> from the City of Manteca, as necessary A SJVAPCD permit will b e <br /> acquired for the abatement device Influent and effluent sampling will b e <br /> conducted as required by the SJVAPCD <br /> 6 6 2 Security <br /> The treatment system will be secured on the subject site using cyclone <br /> fencing <br /> 6 6 3 Maintenance and Reporting <br /> The system will be maintained and operated continuously At least twice <br /> weekly, the system may require adjustments to maintain optimal <br /> performance parameters On a monthly basis, a report will be prepared <br /> detailing the performance of the systems based on influent and effluent <br /> air stream and water stream concentrations As currently being <br /> performed, the groundwater monitoring wells for all site wells will b e <br /> sampled on a quarterly basis followed by a complete report detailing the <br /> methods and findings of the well sampling and analyses activities In <br /> addition, ASE will continue to sample the wells on the north shoulder of <br /> West Yosemite Avenue during the period between quarterly sampling <br /> events <br /> Frank's One Stop Remedial Action PIan — August 2001 <br /> -23- <br />