Laserfiche WebLink
xylenes at o. 9 ppm and 8 . 3 ppm, respectively. <br /> It also states that a quarterly groundwater monitoring <br /> program should be initiated and a well should be <br /> installed closer to the fo er tank pit area. <br /> 12-22-89 Groundwater samples taken this date. Depth to water <br /> measurements were 23 . 06 ' , 2 2 .68 ' and 23 . 58 ' BGS for MW#1, <br /> MW#2 , and MW#3 , respectively. Gradient direction is to <br /> the North-North west, towards and slightly in between <br /> MW#1 and MW#2 . All three wle lls still show contamination, <br /> again with MW#2 showing the highest levels with benzene <br /> at 4 . 2 ppb. Gradient direction is consistent to the <br /> North-North west. <br /> 12-13-90 PHS/EHD sends letter to Gary Brophy advising that PHS/EHD <br /> is asking the CVRWQCB for official enforcement action. <br /> PHS/EHD also sends to the SWRCB a detailed description of <br /> site specific charges. <br /> 02-01-90 PHS/EHD receives first quarterly monitoring report. <br /> 03-09-90 PHS/EHD receives RB comments. RB would like a well <br /> closer to the former tank pit area to determine if the <br /> levels are such that would require active remediation, <br /> the existing wells are not, adequate for that purpose. <br /> 03-29-90 PHS/EHD sends letter to requesting an additional MW <br /> closer to the former tank pit area and further definition <br /> of the north, east and westerly borders of the <br /> contamination. Also states that the "headspace" method <br /> used for analysis is not sufficient to verify non detect <br /> conditions. <br /> Groundwater samples collected this date. Depth to water <br /> measurements show ground-water is still around 22 ' -23 ' <br /> BGS, similar' to the last sampling event. The only well <br /> to show contamination this round is MW#2 , with a benzene <br /> level of 44 . 0 ppb. <br /> 07-02-90 Depth to water measurements reveal that the watertable <br /> has dropped approximately 1' -2 ' BGS. Only 'MW#2 and MW#3 <br /> detected contamination this s round as TPH as diesel at 280 <br /> ppb and 480 ppb, respectively. Gradient is still <br /> consistent to the North-North West. <br /> 08-09-90 PHS/EHD sends RP enforcement letter requesting workplan <br /> for the groundwater inves igation. <br /> 10-o8-90 PHS/EHD sends RP second a forcemeat letter requesting a <br /> meeting. <br />