Laserfiche WebLink
Daljit Sabharwal, Vice President <br /> September 4, 2002 <br /> Page 3 <br /> Developing (Mask) <br /> 1. Repair the emergency exit light. CFC 1211 <br /> 2. Repair the damaged secondary containment systems. CFC 8003.1.3.3 <br /> 3. Clean up all chemical spillage and handle as hazardous waste. CFC 8001.5 <br /> 4. Repair or replace the damaged sprinkler heads. CFC 1001.5.1 <br /> Stripper Room/Screen Wash <br /> 1. Remove the hazardous waste from inside the secondary containment system. <br /> This system shall be kept clean and dry. CFC 8003.1.3 <br /> 2. Label all containers for their contents. Some containers are unmarked. CFC <br /> 8001.7 <br /> 3. Replace the sprinkler heads that have been damaged from chemical vapor <br /> exposure. CFC 1001.5.1 <br /> 4. Flammable liquids shall be stored in the approved flammable liquid storage <br /> cabinet. CFC 8001.10.6.2 <br /> 5. Remove the corrosive chemical build-up on the containers and the piping. CFC <br /> 8001.5.2.4 <br /> Plating Room #1/Manual Plating Room <br /> 1. Remove the chemical contamination outside the piping and on the floor around <br /> the Black Oxide machine. CFC 8001.5.2.4 <br /> 2. Repair the leaking pipes at the back of the Black Oxide Tank Ventilation System. <br /> CFC 8001.4 <br /> 3. Remove the build-up of corrosion at the backside of the tank system. CFC <br /> 8003.1.3 <br /> 4. Remove all chemical build-up and garbage from the flow trench. CFC 8001.1.3.2 <br /> 5. Remove the chemical contamination on the line machine support system. CFC <br /> 8001.1.3 <br /> ical wiring located in the back of the multi-layer stripper. <br /> 6. Repair the exposed electr <br /> CFC 8504 <br /> 7. Repair the exposed electricmulti-layer <br /> onchemical <br /> the Ifloorof cleaner. 0 <br /> he et 85system. <br /> 8. Remove the build-up of chemical waste <br /> CFC8003.1.3 <br /> age to the line structure supports; the footings and steel <br /> g. Repair the chemical dam <br /> rails are deteriorating. CFC 8001.4.7.1 <br /> 10. Repair the concrete flooring beneath and around the micro-plate nickel sulfamate <br /> bath. The liquid leaks areseverely <br /> wiring onp theng the Ammonloor. CFC ium um Hydroo de etch machine. <br /> 11. Protect the open electrical9 <br /> CFC 8504 <br />