Laserfiche WebLink
4 . Project Developer shall develop and submit a Project Stormwater Plan that identifies the methods <br /> to be employed to reduce or eliminate stormwater pollutant discharges through the construction , <br /> operation , and maintenance of source control measures , low impact development design , site <br /> design measures , stormwater treatment control measures , and hydromodification control <br /> measures . <br /> 5 . Runoff from non - residential areas shall be pretreated on -site before discharge intothe MHCSD <br /> public stormwater collection system . <br /> 6 . Catch basin inserts -( Decontaminators ) shall be installed in each storm drain . The decontaminator <br /> shall comply with MHCSD Detail SD - 22 . The type of decontaminators has to be pre - approved by <br /> MHCSD . " <br /> 7 . "A ' No Dumping ' marker shall be installed at each catch basin after the catch - basin is installed <br /> per Detail SD -04 . " <br /> 8 . Grates and Insets shall be protected with geo -fabric material during any nearby construction . <br /> 9 . The contractor will be responsible for purchasing , installing , maintaining all the catch basins and <br /> other storm drain Inlets and decontaminators before , during , and after construction , In perpetuity . <br /> 10 . Recyclable Construction Waste : Recycling of construction wastes , such as wood and metal , sh-all <br /> be made part of the improvement plans and construction specifications for contractors in <br /> compliance with MHCSD requirements . <br /> 11 . Designated Waste Hauler Provider : The MHCSD ' s designated waste hauler , West Valley <br /> Disposal , shall be used for disposal of waste material and recycling o recyclable materials . No <br /> other waste haulers are allowed . <br /> 12 . Construction Water Usage : An encroachment/ hydrant permit is required prior to using water for <br /> construction purposes from a hydrant or any other potable water source . <br /> c . Roadway , Lighting , and Landscape Improvements : <br /> 1 . All roadways , which in this project shall be private , must meet the minimum 20 ' width and be <br /> designed and constructed per the MHCSD acceptable -standards and specifications . <br /> 2 . No parking signs or red curb shall be erected . in all areas where there is to be no parking allowed . <br /> 3 . A sidewalk connectivity plan shall be shown and submitted for the entire project area and with <br /> the surrounding adjacent areas . This plan shall also address pedestrian access off roadway <br /> scenarios . <br /> 4 . Show all handicap ramps and associated crosswalk and signage in all pertinent plan sheets . <br /> 5 . Show all alleyways /driveways details to address pedestrian and parking . <br /> 6 . Provide " private roads , " " No Parking , " and other private notice signage and poles and note on <br /> plans . <br /> 7 . Lighting and landscaping shall follow the design manual and guidelines . <br /> 8 . Landscaping along the roads , alleys and pedestrian connections and in the open space/ mineral <br /> rights reservation area shall be consistent with the approved Neighborhood ` D ' In -Tract <br /> Landscape Guidelines . <br /> PA- 2000126 — Conditions of Approval 8 <br />