My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013565
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRADITION
>
1401
>
2600 - Land Use Program
>
PA-2000126
>
SU0013565
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 8:52:21 AM
Creation date
8/18/2020 3:02:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013565
PE
2611
FACILITY_NAME
PA-2000126
STREET_NUMBER
1401
Direction
S
STREET_NAME
TRADITION
STREET_TYPE
ST
City
MOUNTAIN HOUSE
Zip
95391-
APN
20945039
ENTERED_DATE
8/6/2020 12:00:00 AM
SITE_LOCATION
1401 S TRADITION ST
RECEIVED_DATE
8/17/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 . Any sidewalks that connect the taupe sidewalk along Central Pkwy to the on -site circulation <br /> sidewalk shall be taupe . <br /> 10 . Sound walls parallel to Central Pkwy that are required per the noise study shall have the same <br /> architectural treatment as the themed walls in the Neighborhood ` D ' In -Tract Landscape Plans . <br /> 11 . Digital File : A digital file of the Final Improvement Plans shall be submitted to the MHCSD <br /> consistent with MHCSD File Format requirements . <br /> 12 . Record Drawings : Record Drawings shall be provided prior to acceptance of the improvements <br /> by the MHCSD . <br /> d . Utilities : <br /> 1 . The Developer shall provide documentation for Water Treatment Capacity , Sewer Treatment <br /> Capacity and Water Storage Capacity that has been obtained from Mountain House Developers , <br /> LLC ( Resmark/ MHD ) for the proposed development . <br /> 2 . The Developer and its contractors shall comply with Ordinance No . 4162 " Street Opening and <br /> Pavement Restoration Regulations . " <br /> 3 . Any phased development shall install all utilities required to serve the development . In addition , <br /> if any future adjacent or nearby phases of the development , or adjacent Neighborhoods , will <br /> depend on obtaining service from such utilities , then the utility lines shall be sized to serve these <br /> future developments . <br /> 4 . When public utilities are to be located outside public rights -of-way but within the project boundary , <br /> the Developer shall provide public utility easements for these utilities . The easements shall be <br /> shown on all the Improvement Plans . <br /> 5 . Prior to the submittal of improvement plans for the development , the Developer shall submit to <br /> the MHCSD composite schematic plans for in tract storm drains , sanitary sewers , and water <br /> distribution facilities . <br /> 6 . Water service to the common areas , if applicable , shall not begin without notifying MHCSD of the <br /> intent to start irrigation . The billing process must be set up before water is turned on . Backflow <br /> prevention systems and applicable water meter facilities at the point of connection to the public <br /> water system as required by the MHCSD Standards shall also be installed . <br /> 7 . All water rights shall be dedicated to the MHCSD upon approval of the Improvement Plans . <br /> 8 . Transformers located in the commercial and industrial areas may be placed above ground <br /> provided they are aesthetically designed and /or shielded by landscaping subject to MHCSD and <br /> MID requirements and with prior written approval . <br /> 9 . Per MHCSD ' s ordinance , on -site utilities shall be privately maintained . <br /> 10 . Unused storm drain stubs and sewer stubs shall be cut and capped at the property line . <br /> 11 . Unused water stubs shall be cut at the property line and blow-off Installed . <br /> 12 . The Developer shall prepare an SB 221 report to address the Community' s potable water supply <br /> needs prior to the Final Map approval . <br /> 13 . All utilities such as , but not limited to , water , sewer , storm drainage , shall beplaced in the <br /> ' alleywaysnot the front yards or common landscaping frontage areas . All necessary easements <br /> PA- 2000126 — Conditions of Approval 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.