Laserfiche WebLink
PREVENTATIVE MAINTENANCE cations. Performance Requirement; Leak rate to be less <br /> Annually, Inspect the flapper In the 71 S© to see that it Is than or equal to 0. 17 CFH@2.0" W.C. <br /> open by looking dawn the drop tube opening. Test the <br /> 71 SO drop tube seals with CARE procedure TP-21]i7 .1 D. Torque Specification <br /> If the drop tube seal passes testing, no further mainte- Taptite Screws, # 10-24 thread cutting, 20 In" Ibs mini- <br /> nance Is required . If the drop tube fails testing, replace mum to 35 in-lbs maximum. Testable Models Only: <br /> the drop tube seal with OPW P/N: H11931 M for 4" Socket Adaptor, l /4" NPT, 3.5 ftlbs {42 in-lbs} minimum <br /> Tubes. Re-test the 7150 drop tube with GARB proce- to 5.0 €t lbs (60 in-lbs) maximum . <br /> lure TP-201 .1 D. The lower tube o- ring seal OPW P/N: <br /> H 14840M can also be replaced. If this does not correct IMPORTANT: Leave these installation instructions <br /> the leak the 71 SO needs to be replaced. and maintenance procedures with the station opera- <br /> tor, <br /> FOR TESTABLE MODELS ONLY: The socket adaptor <br /> can be removed and poppet and float movement and <br /> function inspected without removing the valve. See <br /> Page 17 forfull testing details. If replacement parts are <br /> needed for testable models the following Items are <br /> available: OPW P/N 206741 Testable Inlet Tube S/A, <br /> 206740 Socket Adaptor and Cable Assembly, and 61 SOK <br /> L0QQJ,FIoat Kit. <br /> CAUTION: Do not insert any foreign object into drop <br /> tube if flapper is in the closed position. For exam- <br /> pie, a tank level measuring stick . This will damage <br /> the valve and void the Warranty, ALWAYS check <br /> flapper location before "sticking" the tank. if flap= <br /> per Is in the closed position, the tank is either over- <br /> filled and you need to wait until the liquid level goes <br /> down or the 71SO is damaged and needs to be re, <br /> I <br />'. 71 $ O Performance Specifications <br /> This Overfill Prevention Valve has been manufactured <br /> and tested to, and met, the following California speclfi- <br /> r <br /> 18 <br />