Laserfiche WebLink
wells are uncovered or damaged,the Bakersfield office planning approvals, and <br /> of the Department of Conservation/Division of Oil, during subsequent operations. <br /> Gas, and Geothermal Resources shall be contacted to <br /> inspect the well and to approve any remediation <br /> required. Should remedial actions be required,the <br /> applicant will be responsible for implementing the <br /> Department-required corrective action. <br /> Steps to Compliance: <br /> A. This measure will be included as a condition of approval in the CUP. <br /> The project applicant shall include these requirements in project plans <br /> and specifications used by operations staff and contractors. Inspections <br /> and monitoring will be conducted by the DOGGR. <br /> #19 MM 4.5-8. Dewatered. Class A and B biosolids shall Prior to commencement of Environmental Health <br /> 4.5-6 be disposed in the Pit "G" and Pit "F/G Connection operations permitted by Services Department <br /> Area"only. planning approvals, and <br /> during subsequent operations. <br /> Steps to Compliance: <br /> A. This measure will be included as a condition of approval in the CUP. <br /> Inspections and monitoring will be conducted by the EHSD. <br /> 920 MM 4.5-9. The applicant shall, prior to initiation of Prior to commencement of Environmental Health <br /> 4.5-8 Project operations, submit an Integrated Pest biosolids disposal operations Services Department <br /> Management (IPM) Plan for approval by the Kern permitted by planning Kern Mosquito and <br /> Mosquito and Vector Control District and the Kern approvals, and during Vector Control District <br /> County Environmental Health Services Department. subsequent operations. (KMVCD) <br /> The Integrated Pest Management (IPM) Plan shall be <br /> designed to use good housekeeping practices as the <br /> primary tool. The Integrated Pest Management (IPM) <br /> Plan shall include (but not be limited to) measures to <br /> combat vector infestation by ensuring good drainage of <br /> biosolids areas, frequent flushing, clean-up and <br /> maintenance of biosolids disposal edges, and prompt <br /> 1$ <br /> Final Board of Supervisors 3/15/16 <br />