My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0082985_SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
14800
>
2600 - Land Use Program
>
SR0082985_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:04:15 AM
Creation date
12/21/2020 3:02:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0082985
PE
2602
STREET_NUMBER
14800
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20924023
ENTERED_DATE
12/8/2020 12:00:00 AM
SITE_LOCATION
14800 W SCHULTE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 – Project Description <br />Draft Environmental Impact Report February 2021 <br />14800 W. Schulte Road Logistics Center 3-4 <br />Project Objectives <br />Consistent with this purpose and need, the primary objectives sought by the Project are as follows: <br />• Objective 1: Develop a jobs-producing and tax-generating land use near transportation corridors within San <br />Joaquin County that provides diverse economic opportunities for those residing and wishing to invest within <br />southern San Joaquin County. <br />• Objective 2: Concentrate non-residential uses near existing roadways, highways, and freeways in an effort <br />to isolate and reduce any potential environmental impacts related to truck traffic congestion, air emissions, <br />and industrial noise to the greatest extent feasible. <br />• Objective 3: Develop a fiscally sound and employment generating land use that maximizes utilization of an <br />underutilized, previously developed industrially zoned parcel. <br />• Objective 4: Fulfill the existing and growing demand for logistics and warehouse uses in the region. <br />• Objective 5: Construct high-quality industrial development in an appropriate location, consistent with <br />existing surrounding industrial land uses in the vicinity. <br />3.4 Proposed Project <br />3.4.1 Project Characteristics <br />The Project would involve construction and operation of three single-story warehouse buildings totaling <br />approximately 678,913 square feet (Figure 3-4, Site Plan). Building A would be located within the northwestern <br />one-third of the Project site and would include approximately 228,313 square feet of warehouse space and 2,968 <br />square feet of office space (231,281 square feet of building area in total). Bu ilding B would be located within the <br />southwestern one-third of the Project site and would include approximately 278,650 square feet of warehouse <br />space and 3,006 square feet of office space (281,656 square feet of building area in total). Building C would b e <br />located within the eastern one-third of the Project site and would include approximately 163,012 square feet of <br />warehouse space and 2,964 square feet of office space (165,976 square feet of building area in total). <br />Although the future occupants of the Project are unknown at this time, the buildings would be used for light <br />warehousing and distribution uses as defined by the County of San Joaquin Ordinance Code (Section 9-115.585), <br />which is most commonly warehouse and distribution operations. In general, the Project would support a variety of <br />activities associated with the three warehouse buildings, including the ingressing and egressing of passenger <br />vehicles and trucks; the loading and unloading of trucks within designated truck courts/loading areas ; and the <br />internal and external movement of materials around the Project site via forklifts, pallet jacks, yard hostlers, and <br />similar equipment. In addition, the office space would support general internal office activities related to the <br />warehouse uses. <br />Based on typical employee densities for warehousing and distribution uses, it is expected that approximately 555 <br />employees would work on site throughout a typical workday. At this time, no refrigeration is being proposed as part <br />of the Project, and the Project applicant currently has no plans to lease to any tenant needing refrigerated space.
The URL can be used to link to this page
Your browser does not support the video tag.