My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NEWCASTLE
>
7650
>
2800 - Aboveground Petroleum Storage Program
>
PR0527758
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 3:29:08 PM
Creation date
1/19/2021 3:56:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0527758
PE
2832 - AST FAC 10 K - </=100 K GAL CUMULATIVE
FACILITY_ID
FA0003938
FACILITY_NAME
CDCR-NORTHERN CALIFORNIA YOUTH CORRECTIONAL CENTER
STREET_NUMBER
7650
Direction
S
STREET_NAME
NEWCASTLE
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
18115002
CURRENT_STATUS
Inactive, non-billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
7650 S NEWCASTLE RD STOCKTON 95215
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The delivery person makes a connection to electrically ground the delivery truck and system <br /> before off-loading begins. <br /> • The delivery person constantly monitors the off-loading activity. <br /> Additional guidelines include: <br /> • The fuel tanks are equipped with ground-level loading system (i.e., fill ports) and riser pipe which <br /> drain-back to the delivery truck before the loading hose is disconnected. <br /> • The loading point has a spill containment pan with 16-gallon capacity and a hand pump to collect <br /> and manage any accidental spills or leaks, which are pumped into the AST. <br /> • The system has an emergency shutoff valve. <br /> 9.1.2 Central Main Generator <br /> An outside service provider performs tank filling of these fuel tanks storing only diesel. On-site <br /> personnel trained in SPCC procedures do not provide oversight. The filling procedures are the same as <br /> above except for the following: <br /> • The fuel tanks are equipped with a top level loading system which has a spill containment bucket <br /> at the loading point. Leaked or spilled fuel drains back into the tank. <br /> 9.1.3 Emergency Generators <br /> NCYCC Auto Shop personnel perform refueling for the emergency generators located at Central <br /> Kitchen, Delta Room, and O.H. Close Units 1, 4, and Education.The filling procedures consist of the <br /> following: <br /> • All tanks are filled through a fill port located on or near the top of the tank. <br /> • A hose and nozzle is connected to the portable tank. <br /> • After removing the fill cap, the operator inserts the filling nozzle into the fill port. <br /> • The operator activates the fill pump and begins to fill the tank. <br /> • The operator watches the filling operations to ensure the tank is not over-filled. <br /> • Once the operator recognizes that the liquid level reaches near full by observing the direct <br /> reading level gauge on the tank, the operator disengages the filling nozzle to stop fuel flow. <br /> • The cap is replaced on the tank and secured shut. <br /> • The operator returns the hose and nozzle to the truck. <br /> 9.2 Fuel Dispensing Procedures at the Vehicle Fueling Station <br /> • A fuel key fob is required for fueling. <br /> • The person fueling follows the instruction posted at dispenser. <br /> • The person fueling continuously monitors the entire fueling process. <br /> 10. Training, Inspections, and Records <br /> 10.1 Personnel Training <br /> Page 121 <br />
The URL can be used to link to this page
Your browser does not support the video tag.