My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0033424_ENG DESIGNED PLAN
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
10948
>
4200 – Liquid Waste Program
>
SR0033424_ENG DESIGNED PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 5:01:01 PM
Creation date
2/17/2021 4:48:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
ENG DESIGNED PLAN
RECORD_ID
SR0033424
PE
4202
STREET_NUMBER
10948
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WY
City
MANTECA
Zip
95336
ENTERED_DATE
4/9/2003 12:00:00 AM
SITE_LOCATION
10948 S AIRPORT WY
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation Guy Vie: AdvanTei -AX Treat n nt Systems <br /> Step 2 <br /> Excavating Hole for Processing Tank and <br /> AdvanTex Filter <br /> a = - Step 2A: Determining Elevations <br /> f: Before excavating the holes for the tank or filter, consider <br /> the elevations required: <br /> The 2" Filtrate Return Line should be sloped a minimum <br /> Minimum 1.5„ of 114” per foot. If the Filtrate Return Line is less than 6' <br /> long, provide a minimum of 1.5" total elevation difference <br /> " between the outlet of the filter and the inlet of the RSV. <br /> The top of the AdvanTex Filter should end up approximate- <br /> Fiilrate Return Line Length ly 1" to 2" above finished grade. Take into account any <br /> Determiningelevationsof filtrate return line planned or proposed landscaping that might affect the fin- <br /> ished grade of the system. <br /> , �+k i `F: i-f;: Step 213: Outlining Excavation Area <br /> Outline an excavation area (with chalk, paint, string, etc.) <br /> i for both the tank and AdvanTex Filter. Excavate the hole <br /> ti <br /> tom . .wt for the tank per the tank manufacturer's recommendations. <br /> ', Make the hole for the AdvanTex Filter approximately 12" <br /> Aft 6 <br /> s s" wider and longer than the footprint of the AdvanTex Filter. <br /> 4 1 If the filter is going to be placed over the top of the tank, <br /> - very little excavation may be required beyond the excava- <br /> tion of the tank hole. <br /> ., Step 2C: Excavating Hole <br /> g` Excavate to the proper depths as determined above for <br /> proper elevations. Make sure the bottom of the excavation <br /> Y <br /> �} is free of debris, especially rocks and other sharp objects. <br /> s. .. If the bottom of the excavation is uneven or rocky, lay <br /> ` down a 3" bed of sand or pea gravel to create an even, <br /> smooth surface. <br /> Y <br /> Beginning excavation for processing tank <br /> ©2001 Orenco Systems" Inc. EIM-ATX-AX-1 <br /> Information s"hject to change without notice <br /> Rey 1.4Bl01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.